Laserfiche WebLink
Y <br /> September 16, 1`x`31 2076, 1 odi. California <br /> ARCO Service Station No• <br /> REPORT PREPARATION <br /> completing the field work, RESNA will submit to ARCO either a Site <br /> Within 3 months of comp <br /> g T1ic report will <br /> contamination Work Plan or a report on tltc tank removal investigation. <br /> Con procedures, laboratory results, and conclusions. <br /> s as appropriate) to illustrate sample <br /> summarize our field methods, laboratory p <br /> e report will also contain cross sections and map <br /> TIt P <br /> locations and the extent of excavation. <br /> ' <br /> osed procedures for further delineation of hydrocarbons <br /> The Work Plan will describe propher evaluate remedial <br /> tions eased on the <br /> ing to place' ARCO will then furt °p <br /> to soil remaingathered will be considered confidential and released <br /> �., results of the delineation.information g <br /> only with authorization of A <br /> pRO jECT PERSONNEL <br /> #"' 4313)in the State of California,will <br /> Mr.John Bailey Babbitt, a Registered Ge°logist (RG Project Geologist,will manage field and officeti .C' Project. ibis.Eloise Erick, <br /> _.-n{ine pstaff of engineers,geologists,and technicians whose services <br /> be inch. <br /> $ „ operations. RESNA employs a <br /> ee the project through to completion• <br /> will be used to s <br /> td <br /> min <br /> 11 <br /> 3Co08-3N - _ --- — --- <br /> ' �r�oo �lsaewT�i11�RIC1 <br />