My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012744
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
3500 - Local Oversight Program
>
PR0545339
>
ARCHIVED REPORTS_XR0012744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:22:06 PM
Creation date
2/11/2020 4:43:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012744
RECORD_ID
PR0545339
PE
3528
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
02
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F-a.•" .•: R.z'ra•� i:_'-rr _ 'T .�r ': "MMM—WA` "�€s'—'� -• -ur --! <br /> F ' <br /> d <br /> Results of Initial Investigation and Work Plan December 18, 1990 <br /> ARCO Service Station No. 2076, Lodi, California AGS 30008-2 <br /> `r <br /> PREVIOUS WORK <br /> Applied GeoSystems conducted field work at this site in accordance with our Site Safety <br /> Plan No. 30008-1S (Applied GeoSystems, March 23, 1990) and Work Plan for limited <br /> Subsurface Environmental Investigation No. 30008-1W (Applied GeoSystems, September <br /> �. <br /> S. 1990). Applied GeoSystems' methods for field work are described in Appendix A. <br /> (" I <br /> Soil Bonnffs.and Soil Sainaling <br /> Applied GeoSystems was at the site on October 3 and 4, 1990, to observe Wayne Drilling <br /> Company of Uncoin, California; drill six 8-inch-diameter soil borings, five of which were <br /> successfully drilled (B-1 through B-5), while the sixth could not be drilled because of the <br /> proximity of the station building and the canopy overhang. The locations of the soil borings <br /> u <br /> are shown on Plate P2. ? <br /> ® The locations of the borings were selected using ARCO's Preliminary Tank Replacement <br /> Assessment guidelines Borings B-1, B-2, and B-3 were drilled approximately 2-1/2 feet <br /> �! from the edge of the tank area near the fill ends of the underground storage tanks, and <br /> borings B-4 and B-5 were drilled in the area proposed as the new.tank cavity (Plate P-2). , <br /> t <br /> Soil samples were collected during drilling at approximately 5-foot intervals and were _ <br /> classified according to the Unified Soil Classification System(Plate P-4). Descriptions of 3 <br /> R materials encountered are presented in the Logs of Borings (Plates P-5 through P-14). The <br /> materials consisted predominately of sand and silt. The sand was logged as fine to coarse <br /> grained. The Logs of Borings also indicate a trace amount of shale. ' <br /> i <br /> .+4p,1P#ed G008) tvIns <br /> { <br />
The URL can be used to link to this page
Your browser does not support the video tag.