Laserfiche WebLink
Results of Initial Investigation and Work Plan December 18, 1990 <br /> ARCO Service Station No.2076, Lodi, California AGS 30008-2 <br /> The geologist used a photoionization detector (PID) to evaluate the soil samples for <br /> hydrocarbon vapors. PID readings are also included on the Logs of Borings. The geologist <br /> 0 <br /> noted PID readings on the samples from borings B-1 through B-3 up to 159 parts per <br /> million by volume (ppmv). PID readings were not produced by the samples from borings <br /> B-4 and B-5. The geologist did not detect subjective evidence of gasoline hydrocarbons such <br /> as soil discoloration or obvious odor. <br /> The geologist initiated Chain of Custody Records which accompanied the soil samples to <br /> the anal)-tical laboratories. Copies of those documents are in Appendix B. <br /> Borings were drilled to approximately 30 feet below grade or ground water,whichever was <br /> encountered first using ARCO's guidelines. Borings B-1, B-2, and B-5 were terminated <br /> a approximately I foot below the first encounter of ground water,which was approximately <br /> 29 to 30 feet below grade. Ground water was not encountered in borings B-3 and B-4;these <br /> Vii' borings ori were terminated 31 feet below grade. <br /> The borings were backfilled to the ground surface wit2% a neat cement slurry. Cuttings <br /> generated during drilling were placed on and covered with plastic, pending results of <br /> wF laboratory analyses. Four soil samples were collected from the drill cuttings and composited <br /> a into.one sample for laboratory analyses (see Plate P-2 for location of stockpiled so][ and <br /> samples). <br /> Applied GeoSystems advised ARCO of the disposal options for the stockpiled soil. At <br /> ARCO's request,Aronson Excavating and Hauling of Elk Grove,California,hauled the soil <br /> to Sacramento City Landfill on November 21, 1990. In addition, and at the .request of <br /> ARCO,the four additional soil samples were collected from the soil pile and submitted to <br /> 6 <br />