Laserfiche WebLink
r• -'" .. _4;-�§'tsa'.raAQzirruaa.saStR c3� er�iar$sm �wxcPr�.armz-s�v';ozra ssemnssasswr.wxmenvv .,. a.a....�.— -- <br /> 1 <br /> Site Safety Plan March 23, 1990 <br /> Arco Station No, 2076, Lodi, California AGS 30008-1S <br /> The Staff Geologist or Engineer will also act as the Site Safety Officer. As such. the Staff <br /> Geologist or Engineer is responsible for addressing the following items: <br /> o Implementing the Site Safety Plan, Company policy, and procedures <br /> o Requiring and maintaining adequate safety supplies and equipment inventory <br /> onsite <br /> a Conducting daily safety meetings and advising workers regarding hazards <br /> o Site control, decontamination, and contamination-reduction procedures <br /> o Reporting accidents or incidents <br /> ® `:'he Staff Geologist or Engineer has the authority to suspend workany time he or she finds <br /> that the provisions of the Plan are inadequate for worker safety. The Staff Geologist or <br /> Engineer will inform the Project Manager and the Health and Safety Coordinator promptly <br /> of deficiencies within the Plan or individuals or subcontractors whose conduct is not <br /> consistent with the requirements of this Plan. <br /> MEDICAL SURVEILLANCE <br /> Applied GeoSystems personnel and subcontractors engaged in project activities must <br /> participate in a medical surveillance program and must be cleared by the examining <br /> physician(s)to.wear respiratory protection devices and protective clothing for working with <br /> ® hazardous materials. The applicable requirements of Title 8,Section 5216,of the California <br /> Administrative Code, will be observed. The applicable requirements under 29 CFR <br /> 1910.120 of the F—edeml Administrative bode will also be observed. <br /> SAFETY AND ORIENTATION MEETING <br /> Field personnel from Applied GeoSystems and its subcontractors will attend a project- <br /> specific training meeting for safety issues and review the project tasks before beginning <br /> work. The meeting will be Ied by the Project Manager or Staff Geologist or Engineer. In <br /> addition, fit-testingof respiratory p ry protective devices will be conducted as part of the safety <br /> orientation meeting when the use of a respirator may be required. <br /> 2 <br />