My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
3500 - Local Oversight Program
>
PR0545339
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:36:58 PM
Creation date
2/11/2020 4:59:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545339
PE
3528
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
02
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fac. #2076, 800 East Kettleman Lane, Lodi <br /> PHSIEHD requested submittal of the Problem Assessment Report. <br /> Remediation will proceed when the contamination has been defined and <br /> equipment becomes available. The PHSIEHD indicated that this site is a low <br /> priority. <br /> ARCO issued the Problem Assessment Report on 4115193. Quarterly <br /> status reports dated 4127193, 712193, 1113193 & 3124194 have also been issued <br /> and document that groundwater is not impacted by hydrocarbons. <br /> Fac. #434, 501 Kettleman Lane, Lodi <br /> PHSIEHD requested that vapor extractioh and quarterly monitoring <br /> continue. <br /> ARCO has submitted quarterly status repo its over the past year. ARCO <br /> also submitted a work plan for clean-up confirmation borings to the PHSIEHD on <br /> 3122194. Groundwater beneath and adjacent to the site has been nondetect to <br /> near nondetect since February of 1993. <br /> ARCO recently received approval from the San Joaquin Valley Air <br /> Pollution Control District to use a biofilter to remediate the low concentrations of <br /> hydrocarbons being emitted from the operating vapor extraction system. The air <br /> emission treatment unit currently at the site will be moved to ARCO facility <br /> #2093 in Tracy in the near future. <br /> 6 0 <br /> Fac. # 100, 25775 Patterson Pass Road, Tracy <br /> PHSIEHD requested an investigation of the depth at which groundwater <br /> enters the water supply well. Off-site assessment is to continue. <br /> ARCO addressed the depth to groundwater at the site in a letter report to <br /> the PHSIEHD dated 11/4/93_ ARCO has sent an access agreement to Mr. <br /> Robert Vieira on 6115193 and again on 414!94 for the purpose of drilling on his <br /> property in order to further define the extent of soil contamination. Mr. Vieira has ' <br /> not replied to ARCO. <br /> Fac. #2093, N. Tracy Blvd., Tracy i <br /> ARCO was to install remediation piping and begin vapor extraction. Since i <br /> the 3193 meeting ARCO has performed the following: <br /> a) submitted quarterly status reports dated 6114193, 1118193, & <br /> 319194. <br /> b) submitted a Final Remediation Ian dated 5114193 <br /> c) submitted a Work Plan for Soil excavation and. Sampling dated <br /> 51'14193, <br /> d) submitted a limited Subsurface Investigation report dated 711193 <br /> e) issued the Underground StoragTank Removal & Soil Sampling <br /> report dated 10114193. <br />
The URL can be used to link to this page
Your browser does not support the video tag.