My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
3500 - Local Oversight Program
>
PR0545339
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:36:58 PM
Creation date
2/11/2020 4:59:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545339
PE
3528
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
02
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
During the tank replacement project, all below surface remediation piping <br /> necessary for vapor extraction and air spargingi was installed. Recent approval <br /> from the San Joaquin Valley Air Pollution Control District to use an alternative air <br /> emission abatement device at facility#434 in Lodi will allow ARCO to transfer <br /> the air emission abatement unit from the Lodi facility to this facility in the near <br /> future. <br /> Fac. #760, 225 S. Cherokee Lane, Lodi <br /> PHS/EHD requested that additional investigation west, north and east of <br /> the waste oil tank be performed. Also, additional assessment was requested in <br /> the area of the new tank complex and groundwater monitoring wells were <br /> requested to be installed. <br /> ARCO has supplied the following reports to the PHSIEHD since the 3193 <br /> meeting: a) Addendum to the Work Plan for installing groundwater wells, <br /> dated 1218193, <br /> I <br /> b) Status Report, First Quarter '94I dated 618194. <br /> ARCO installed three groundwater monitoring wells at the site in late <br /> January, 1994. ARCO attempted to obtain acceas agreements from the City of <br /> Lodi and a neighboring property owner to characterize the extent of <br /> contamination north and west of the former waste oil tank. Ms. Pamela Martinez <br /> was mailed access agreements on 5111/93 and 6/15193. ARCO has not received <br /> a response from her. The City of Lodi denied ARCO access into the alley, <br /> although ARCO named Lodi as an additional insured, because Lodi was <br /> planning to sell the alley property to the adjacent property owners. Thus, due to <br /> refusal from off-site property owners, ARCO has not been able to characterize <br /> north and west of the former waste oil tank. Wel MW-3 characterizes the area <br /> immediately east of the former waste oil tank. <br /> ARCO has investigated the need for additional assessment in the area of <br /> the current product tanks_ Seven soil samples were obtained at a depth of 12 <br /> feet which is the base of the current tank excavation. Only one sample detected <br /> TPHg concentrations above the detection limit of 1.0 ppm and had a <br /> concentration of 1.4 ppm. Two earlier soil borin6s within this area had nondetect <br /> soil samples at depths of 15 and 20 feet. Additionally, soil samples from these <br /> borings did not create readings on the PID meter. ARCO installed well MW-2 <br /> adjacent to the tank complex in January of 1994. Soil data indicate that soil <br /> contamination in this area was restricted to two vertically limited zones at 21.5 <br /> feet and 36.5 feet. <br /> ARCO has also allocated funds to purchase an air emission abatement <br /> treatment unit for this site. ARCO expects delivery of this unit later this year. <br /> Fac. #6080, 85 E. Louise, Lathrop . <br /> . PHSIEHD requested that the existing monitoring wells be sampled yearly <br /> at a minimum. <br /> The monitoring wells at the site are scheduled to be sampled <br /> during August of 1994. <br />
The URL can be used to link to this page
Your browser does not support the video tag.