Laserfiche WebLink
Messers Trommer and Larson Page 2 <br /> Re:Annual Five-Year Review Various Sites 12 June 2009 <br /> Page 2 of 2 <br /> 715 N. Hunter Street — Your draft letter recommends the EHD to direct the RP to restart the <br /> remediation system. The RP had turned off the system after his CUF letter of commitment was <br /> suspended. The site is near another site under Regional Board oversight that has a PCE issue. <br /> The EHD has attempted to obtain monitoring data from the adjacent site to evaluate the <br /> potential for adversely affecting the PCE plume through operation of the DPE system on the 715 <br /> site. The EHD has contacted the regional Boars again to obtain the information, which has not <br /> been submitted to GeoTracker, and the Regional Board contact is going to push to get the data <br /> uploaded to GeoTracker. The EHD will issue a directive regarding resumption of site <br /> remediation in the next few weeks. <br /> If you need more information to complete your review of these sites, contact Nuel Henderson, <br /> Engineering Geologist, at (209) 468-3436 or by mail (address on the letterhead). <br /> KGs<� <br /> Nuel C. Henderson, Jr., PG <br /> Engineering Geologist <br /> C. Jim Barton, PG, CVRWQCB, 11020 Sun Center Dr. #200, Rancho Cordova, CA 95670 <br /> 5-Year Review Comment Letter D 0609.doc <br />