Laserfiche WebLink
2.3 Activity Hazard Analysis (REPLACE THIS SECTION) <br /> Table 2-1 lists the activity hazard analysis and specific hazard control procedures, which have <br /> been prepared for each known activity or operation, anticipated at the site. There are no <br /> biological or radiological hazards associated with this site. Additional activities or operations <br /> that may be identified, but not included in this analysis will be reviewed on an "as needed basis" <br /> and inserted into this document as an addendum when required. <br /> Table 2-1 <br /> Activity Hazard Analysis <br /> Activities Hazards Recommended Equipment Inspection Training <br /> Controls to be used Requirements Requirements <br /> Shoveling Back pain and The SSHO will review with site Shovel None None <br /> debris strain personnel,the proper lifting <br /> techniques and procedures for <br /> avoiding back pains and strains <br /> when manually moving <br /> material. <br /> Excavating Confined space Prior to entry, Backhoe, Prior to operation, Trained operator <br /> activities excavations/trenches that Loader, ensure equipment is <br /> exceed 4 feet in depth will be in good condition <br /> properly shored and monitoring per Title 8 CCR <br /> will be performed. Tetra Tech Section 1593 <br /> employees and subcontractors <br /> will not enter excavations <br /> greater than 4 feet bgs. <br /> Removing Heavy Site personnel who are not Backhoe Prior to operation, Trained operator <br /> railroad equipment operating equipment will ensure equipment is <br /> tracks movement maintain a safe distance from in good condition <br /> earth moving equipment. per Title 8 CCR <br /> Section 1593 <br /> Soil and Earth moving Site personnel who are not Loader Prior to operation, Trained operator <br /> debris equipment operating equipment will ensure equipment is <br /> movement maintain a safe distance from in good condition <br /> including earth moving equipment. per Title 8 CCR <br /> excavation Hearing protection will be used Section 1593 <br /> and site by operators and personnel in <br /> restoration the vicinity of operating <br /> machinery. <br /> Rough&Ready Island 7 Tetra Tech, Inc. <br /> Final Work Plan Addendum December 11, 1998. <br />