My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2900 - Site Mitigation Program
>
PR0523599
>
COMPLIANCE INFO_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 4:53:28 PM
Creation date
2/12/2020 3:59:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 2
RECORD_ID
PR0523599
PE
2960
FACILITY_ID
FA0015929
FACILITY_NAME
PORT OF STOCKTON BLDG #16
STREET_NUMBER
305
STREET_NAME
FYFFE
STREET_TYPE
AVE
City
STOCKTON
Zip
95201
CURRENT_STATUS
01
SITE_LOCATION
305 FYFFE AVE BLDG 16
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Activities Hazards Recommended Equipment Inspection Training <br /> Controls to be used Requirements Requirements <br /> Water Contact/Splash Wear PPE Modified Level D Geoprobe Drill Prior to operation, HAZWOPER <br /> sampling (see section 5.0) Rig ensure equipment is and C57 license <br /> in good condition for driller; <br /> per Title 8 CCR <br /> Section 1593 <br /> High- Contact/Splash Site personnel who are Steam Cleaner, prior to operation, Trained operator <br /> pressure operating equipment will wear Loader ensure equipment is <br /> steam PPE Modified Level D(see in good condition <br /> cleaning section 5) per Title 8 CCR <br /> Section 1593 <br /> Throughout Slip,trip,and Proper housekeeping will be NA NA NA <br /> project falls maintained around the site. All <br /> duration small tools and materials will <br /> be kept out of walking areas. <br /> Throughout Severe weather Site personnel will be NA NA HAZWOPER <br /> project responsible for monitoring <br /> duration weather conditions. Severe <br /> weather precautions are <br /> discussed in Section 2.2.3 of <br /> this plan. <br /> Throughout Cold stress Site personnel will be trained to NA NA HAZWOPER <br /> project recognize signs and symptoms <br /> duration, of cold stress. Workers will be <br /> especially acclimated,periodically <br /> during the warmed up. <br /> winter <br /> months <br /> Throughout Sun exposure Site personnel should use NA NA NA <br /> project sunscreen lotions with SPFs of <br /> duration at least 15. <br /> Title 8 Sec. 1593: All vehicles in use shall be checked at the beginning of each shift to assure that the following parts, <br /> equipment, and accessories are in safe operating condition and free of apparent damage that could cause failure while in use: <br /> service brakes, including trailer brakes; connections; parking system (hand brake); emergency stopping system (brake); tires; <br /> horn; steering mechanism; coupling devices; seat belts; operating controls; and safety devices. All defects affecting safe <br /> operation shall be corrected before the vehicle is placed in service. These requirements also apply to equipment such as lights, <br /> reflectors,windshield wipers,defrosters,fire extinguishers,etc where such equipment is necessary. <br /> 3.0 STAFF ORGANIZATION (REPLACE THIS SECTION) <br /> All project personnel (including subcontractors) are subject to this document. Supervisory and <br /> regulatory personnel who visit the project site during field operations are also subject to this HSP <br /> if proceeding in the work zone. <br /> Rough&Ready Island 8 Tetra Tech, Inc. <br /> Final Work Plan Addendum December 11, 1998. <br />
The URL can be used to link to this page
Your browser does not support the video tag.