My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2900 - Site Mitigation Program
>
PR0523599
>
COMPLIANCE INFO_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 4:53:28 PM
Creation date
2/12/2020 3:59:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 2
RECORD_ID
PR0523599
PE
2960
FACILITY_ID
FA0015929
FACILITY_NAME
PORT OF STOCKTON BLDG #16
STREET_NUMBER
305
STREET_NAME
FYFFE
STREET_TYPE
AVE
City
STOCKTON
Zip
95201
CURRENT_STATUS
01
SITE_LOCATION
305 FYFFE AVE BLDG 16
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 1 <br /> Introduction <br /> On behalf of the United States Army Corps of Engineers (USACE) Sacramento District, Tetra <br /> Tech, Inc. (Tetra Tech) has prepared the following work plan to investigate the extent of soil <br /> contamination resulting from a hydraulic oil leak over a railroad track on Rough and Ready <br /> Island in Stockton, California. The scope of work (SOW) has been authorized under Task Order <br /> 0008 of Contract DACW05-98-D-0019. <br /> This work plan is organized as follows: <br /> Section 2 — Site Background: This section presents an overview of the impacted area and the <br /> type of wastes requiring removal and off-site disposal. A summary of the results of the previous <br /> site delineation and remedial activities conducted is included. <br /> Section 3 — Scope of Work: This section outlines the project objectives and the technical <br /> approach. This section includes Tetra Tech's proposed field methodology to conduct <br /> groundwater sampling via hydropunch, to remove the railroad tracks, ties, and ballast, excavate <br /> the hydraulic oil impacted materials, conduct soil confirmation sampling, and restore the site. <br /> Section 4 — Project Organization: This section includes a description of the project organization <br /> and responsibilities of team members. <br /> Section 5 —Project Schedule: A project schedule delineating tasks and duration is included. <br /> A Sampling and Analysis Plan and a Health and Safety Plan are included in the Appendices. <br /> Rough&Ready Island 1 Tetra Tech,Inc. <br /> Revised Draft Work Plan November 18, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.