My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
425
>
2900 - Site Mitigation Program
>
PR0541913
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 7:07:47 PM
Creation date
2/13/2020 11:53:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541913
PE
2960
FACILITY_ID
FA0024043
FACILITY_NAME
FRONTIER TRANSPORTATION FACILITY
STREET_NUMBER
425
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21220009
CURRENT_STATUS
01
SITE_LOCATION
425 LARCH RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
672
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i 14 <br /> Remedial Action Plan RE: 425 W. Larch Street, Tracy, CA M <br /> October I, 2008 W&A Project No. : FTIM-08-002 <br /> Summary of Remedial Alternative Costs <br /> Frontier Transportation, Inc. <br /> 425 W. Larch Road <br /> Tracy, CA 95376 <br /> Remedial Alternative Assumptions Cost <br /> Groundwater Extraction The groundwater extraction system will 1 . Well Installation (2 wells) $22,500 <br /> and Treatment consist of 2 new extraction wells and 3 2. Application to sewer $39000 _ <br /> existing wells, with each well extracting 3 . Design, Equipment, Permitting and <br /> $ 165,000 <br /> approximately 2gpm . The treatment Construction - <br /> system will consist of three 1000-pound 4. Life Cycle (O&M-7 years) $65 ,000 <br /> carbon vessels and associated 5 . Sewer Fees (7 years) $59,000 <br /> instrumentation to monitor flow and 6. Utility Cost (O&M-7 years) $94800 <br /> control performance. Disposal to sewer is 7. Laboratory Cost (O&M-7 years) $21,000 <br /> assumed possible. Operation of the GETS 8. Monitoring Cost (7 yrs + 3 yrs) $340,000 <br /> system is assumed to reduce COC <br /> concentrations to levels approaching li <br /> cleanup goals/NA in approximately 7 <br /> i <br /> years, hence this time period is used for Total $685,300 <br /> estimating life cycle and utility casts. Past <br /> remedial groundwater monitoring for an <br /> additional 3 years after completion of <br /> yam/ WWM9NKETM E as50Ct NfES, tNC. <br /> ��s'7 Fn.mexiew fl suci Ceusu Isc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.