My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
425
>
2900 - Site Mitigation Program
>
PR0541913
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 7:07:47 PM
Creation date
2/13/2020 11:53:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541913
PE
2960
FACILITY_ID
FA0024043
FACILITY_NAME
FRONTIER TRANSPORTATION FACILITY
STREET_NUMBER
425
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21220009
CURRENT_STATUS
01
SITE_LOCATION
425 LARCH RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
672
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Remedial Action Plan RE: 425 W. Larch Street, Tracy, CA <br /> October 1 , 2008 W&A Project No. : FTIM-08-002 <br /> I <br /> Summary of Remedial Alternative Costs <br /> Frontier Transportation, Inc. <br /> 425 W. Larch Road <br /> Tracy, CA 95376 <br /> Remedial Alternative Assumptions Cost <br /> Dual Phase Extraction The DPE system will consist of 2 new 1 . Well Installation (2 wells) $22,500 <br /> extraction wells and 3 existing wells, with 2. Application to sewer $3,000 <br /> each well extracting approximately 5 gpm. 3 . Design, Equipment, Permitting and <br /> The treatment system will consist of three Construction $210,000 <br /> 1000-pound carbon vessels and associated 4. Life Cycle (O&M-3 years) $37,000 <br /> instrumentation to monitor flow and 5. Sewer Fees (3 years) $325000 <br /> control performance. The hermal oxidizer 6. Utility Cost (O&M-3 years) $48,000 <br /> will have a 20 hp liquid ring blower. 7. Laboratory Cost (O&M-3 years) $26,500 <br /> Disposal to sewer is assumed possible. 8. Monitoring Cost (3 yrs + 3 yrs) $204,000 <br /> Operation of the DPE system is assumed <br /> to reduce COC concentrations to levels <br /> approaching cleanup goals/NA in <br /> approximately 3 years, hence this time <br /> period is used for estimating life cycle and Total $5839000 <br /> utility costs. Post remedial groundwater <br /> monitoring for an additional 3 years after <br /> completion of DPE is assumed. <br /> Chemical Oxidation The installation of 5 ozone sparge wells is 1 . Design & Permitting $103000 _ <br /> using Ozone needed to provide coverage to the known 2. Well Installation ( 5 Wells) $32,000 <br /> plume. Ozone system to be purchased is 3 . Equipment and Construction $ 1525000 <br /> capable of generating ozone at a rate of 2.5 4. Life Cycle (O&M-3 years) $34,000 <br /> lbs/day. Active remediation for a period 5 . Laboratory Cost (O&M-3 yrs) $6000 <br /> of 3 years will be needed to reach 6. Utility Cost (O&M-3 years) $4,000 <br /> remediation goals; 3 years of additional 7. Monitoring Cost (3 yrs + 3 yrs) $204,000 <br /> post-remedial mon/sampling/reporting. <br /> Total $5005000 <br /> VVWvxo . o `6ass INC.res, <br /> .: r.».�,. NC. <br /> I M <br />
The URL can be used to link to this page
Your browser does not support the video tag.