My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 8:17:31 PM
Creation date
2/13/2020 3:05:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> L & M OPERABLE UNIT- FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, <br /> REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT <br /> Status of Remediation Activities <br /> January 31, 2011 <br /> conducted quarterly (at a minimum) for wells that repeatedly contain SPH sheen or a <br /> measurable thickness of SPH. <br /> The DPE Non-aqueous Extraction Technique (NET) free product removal system and periodic <br /> extraction from monitoring wells have removed approximately 8.3 gallons of SPH from <br /> groundwater beneath the Site between July 15, 2010 and October 14, 2010. Approximately <br /> 1,745.4 gallons of SPH have been removed from groundwater beneath the Site since May 10, <br /> 2004. <br /> Historical DPE system operations, analytical data, and SPH removal data are presented in <br /> Tables 10 through 17. Chemical concentrations and mass removal graphs are presented on <br /> Figures 31 through 34. Analytical Lab reports and field data sheets for all O&M activities are <br /> presented in Appendix G <br /> 3.2 APARTMENT SOIL VAPOR EXTRACTION SYSTEM <br /> 3.2.1 Apartment Soil Vapor Extraction Operations Summary <br /> The Apartment SVE (ASVE) system has operated near continuously since May 31, 2007 <br /> following retrofit construction that began on December 12, 2006. The ASVE system is <br /> comprised of horizontal wells (ASVE-1 through ASVE-6), a 100-gallon liquid/vapor separator, <br /> and a Solleco 250 cubic feet per minute (cfm) vapor extraction system with a Roots URAI 56 <br /> 10-hp positive displacement blower. Vapor from both the ASVE and the SVE system is abated <br /> with a 750 scfm thermal oxidizer. <br /> Since May 31, 2007 the 750 scfm SVE and ASVE vapor abatement system has been operated <br /> under SJVAPCD permit number N-4878-2-0. <br /> 3.2.2 Apartment Soil Vapor Extraction Operational and Analytical Data—4Q10 <br /> Due to non-detectable levels of all evaluated analytes, no measurable amount of TPHg, <br /> benzene, or MtBE was removed during 4Q10 (September 15, 2010 to December 14, 2010). To <br /> date the ASVE system has removed approximately 2,076 pounds (340 gallons) of TPHg, and <br /> 0.13 pounds (0.02 gallons) of benzene from soil vapor beneath the Delta View Apartments. No <br /> measurable amount of MtBE has been detected since system startup. <br /> Historical ASVE system operations and analytical data are presented in Tables 18 through 20. <br /> 3.3 SOIL VAPOR EXTRACTION SYSTEM <br /> 3.3.1 Soil Vapor Extraction Operations Summary <br /> The SVE system has run near continuously since May 31, 2007 following retrofit construction <br /> that began on December 12, 2006. The SVE system is comprised of horizontal vapor wells: <br /> I:\Tidewater\TW Stockton(Parcel 2A-0415)\Reports\QMR\2010\4010-Annual\4Q10 and Annual OSSRQRSRQMR Stockton_FINAL.doc 3.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.