My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 8:17:31 PM
Creation date
2/13/2020 3:05:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> L & M OPERABLE UNIT- FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, <br /> REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT <br /> Status of Remediation Activities <br /> January 31, 2011 <br /> SVE-1 through SVE-11, a 100-gallon liquid/vapor separator, and a Solleco 500 cfm vapor <br /> extraction system with a Roots URAI 59 20-hp positive displacement blower. Vapor from both <br /> the ASVE and the SVE system is abated with a 750 scfm thermal oxidizer. <br /> Since May 31, 2007 the 750 scfm SVE and ASVE vapor abatement system has been operated <br /> under SJVAPCD permit number N-4878-2-0. <br /> 3.3.2 Soil Vapor Extraction Operational and Analytical Data—4Q10 <br /> During 4Q10 (September 15, 2010 to December 14, 2010) the SVE system removed <br /> approximately 9.1 pounds (1.5 gallons) of TPHg soil vapor. No measurable amount of benzene <br /> or MtBE was detected or removed. To date, the SVE system has removed approximately <br /> 2,317 pounds (380 gallons) of TPHg and 0.14 pound (0.02 gallon) of benzene from soil vapor <br /> beneath the L&M OU. No measurable amount of MtBE has been detected or removed since <br /> system startup. Historical SVE system operations and analytical data are presented in Tables <br /> 21 through 24. <br /> I:\Tidewater\TW Stockton(Parcel 2A-0415)\Reports\QMR\2010\4010-Annual\4Q10 and Annual OSSRQRSRQMR Stockton_FINAL.doc 3.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.