My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 8:17:31 PM
Creation date
2/13/2020 3:05:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> L & M OPERABLE UNIT- FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, <br /> REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT <br /> Annual Summary of Remediation -2010 <br /> January 31, 2011 <br /> 6.1.2 DPE System 2010 Analytical Summary- Soil Vapor Extraction <br /> The SVE component of the DPE system removed approximately 329.10 pounds (54 gallons) of <br /> TPHg, throughout 2010 (below). No measurable amount of benzene or MtBE was removed <br /> during this time period. <br /> Hour TPHg Benzene MtBE <br /> Meter Cumulative Cumulative Cumulative <br /> Date Reading Recovery Recovery Recovery <br /> Sampled hours lbs lbs lbs <br /> 12/9/2009 26,485.1 7,224.1 5.03 0.00 <br /> 1/12/2010 27,189.3 7,251.5 5.03 0.00 <br /> 2/4/2010 27,524.4 7,256.9 5.03 0.00 <br /> 3/2/2010 28,004.5 7,286.7 5.03 0.00 <br /> 4/7/2010 28,700.5 7,304.3 5.03 0.00 <br /> 5/12/2010 29,299.1 7,355.2 5.03 0.00 <br /> 6/10/2010 29,895.7 7,382.9 5.03 0.00 <br /> 7/12/2010 30,233.8 7,404.2 5.03 0.00 <br /> 8/4/2010 30,671.4 7,439.2 5.03 0.00 <br /> 10/7/2010 31,331.7 7,464.3 5.03 0.00 <br /> 11/17/2010 31,796.0 7,471.9 5.03 0.00 <br /> 12/14/2010 32,444.0 7,553.2 5.03 0.00 <br /> Period Days: 370 <br /> Period Operating Days: 248 <br /> Period Pounds of TPHg Removed: 329.10 <br /> Period Pounds of Benzene Removed: 0.00 <br /> Period Pounds of MtBE Removed: 0.00 <br /> 6.1.3 SPH Removal Summary -2010 <br /> The DPE Non-aqueous Extraction Technique (NET) free product removal system and periodic <br /> extraction from monitoring wells have removed approximately 28.3 gallons of SPH from <br /> groundwater beneath the Site during quarterly visits between January 14, 2010 and October 14, <br /> 2010 (below). <br /> NET <br /> NET System TPE TPE SPH SPH <br /> System Cumulative Cumulative Cumulative Extraction Extraction Total <br /> Period SPH SPH SPH SPH Period Cumulative SPH <br /> Recovery Recovery Recovery Recovery Recovery Recovery Recovery <br /> Date Notes (gallons) (gallons) (gallons) (gallons) (gallons) (gallons) (gallons) <br /> 1/14/2010 1,575 7.7 133.4 1,724.7 <br /> 4/15/2010 1,575 5.8 139.2 1,730.5 <br /> 7/15/2010 1,575 6.5 145.7 1,737.0 <br /> 10/14/2010 1,575 8.3 154.0 1,745.3 <br /> Total Gallons SPH Recovered During 2010: 28.3 <br /> I:\Tidewater\TW Stockton(Parcel 2A-0415)\Reports\QMR\2010\4010-Annual\4Q10 and Annual QSSRQRSRQMR Stockton_FINAL.doc 6.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.