Stantec
<br /> L & M OPERABLE UNIT- FOURTH QUARTER AND ANNUAL 2010 SITE STATUS,
<br /> REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
<br /> January 31, 2011
<br /> 6.0 Annual Summary of Remediation - 2010
<br /> 6.1 DPE SYSTEM OPERATIONAL AND ANALYTICAL SUMMARY- 2010
<br /> During 2010 (December 9, 2009 to December 14, 2010), the DPE system (GWE and SVE
<br /> combined) was 67% operational (248 out of 370 days). The system shut down on August 28th
<br /> due to the failure of one of the oil-water separator transfer pumps. The system was
<br /> reconfigured without the first oil-water separator and restarted on October 4th. From November
<br /> 16th to November 19th the DPE wells were closed during pilot testing. On December 6th the
<br /> system hour meter was found to be functioning intermittently so it was removed and replaced.
<br /> 6.1.1 DPE System 2010 Analytical Summary - Groundwater Extraction
<br /> The GWE component of the DPE system removed approximately 908,310 gallons of water from
<br /> the subsurface and adsorbed approximately 4.64 pounds (0.76 gallons) of TPHg, 1,023 pounds
<br /> (142.5 gallons) of TPHd, 731.3 pounds (96 gallons) of TPHo, and 0.05 pounds (0.01 gallons) of
<br /> TBA throughout 2010 (below). No measurable amount of benzene, or MtBE was removed
<br /> during this time period.
<br /> TPHg TPHd TPHo Benzene TBA MtBE
<br /> System Data Recovery Recovery Recovery Recovery Recovery Recovery
<br /> Hour Meter Totalizer Cumulative Cumulative Cumulative Cumulative Cumulative Cumulative
<br /> Date Reading Reading Adsorbed Adsorbed Adsorbed Adsorbed Adsorbed Adsorbed
<br /> Sampled (hours) (gal) (lbs) (lbs) (lbs) (lbs) (lbs) (lbs)
<br /> 12/9/2009 26,485.1 2,924,230 146.91 8,524.69 4,387.62 0.057 1.018 0.002
<br /> 1/12/2010 27,189.3 3,001,930 147.08 8,576.86 4,427.81 0.057 1.021 0.002
<br /> 2/4/2010 27,524.4 3,037,370 147.17 8,603.76 4,448.35 0.057 1.021 0.002
<br /> 3/2/2010 28,004.5 3,179,415 147.60 8,729.37 4,542.56 0.057 1.025 0.002
<br /> 4/7/2010 28,700.5 3,289,120 147.92 8,832.79 4,621.26 0.057 1.028 0.002
<br /> 5/12/2010 29,299.1 3,363,840 148.99 8,896.99 4,655.24 0.057 1.037 0.002
<br /> 6/10/2010 29,895.7 3,421,390 149.80 9,125.04 4,815.35 0.057 1.067 0.002
<br /> 7/12/2010 30,233.8 3,512,380 150.15 9,463.58 5,072.67 0.057 1.067 0.002
<br /> 8/4/2010 30,671.4 3,564,680 150.43 9,484.92 5,090.30 0.057 1.067 0.002
<br /> 10/7/2010 31,331.7 3,647,460 150.87 9,511.78 5,102.31 0.057 1.067 0.002
<br /> 11/17/2010 31,796.0 3,747,620 151.49 9,543.95 5,116.85 0.057 1.067 0.002
<br /> 12/14/2010 32,444.0 3,832,540 151.55 9,547.70 5,118.87 0.057 1.067 0.002
<br /> Period: December 9,2009-December 14,2010
<br /> IIPeriod Days 370
<br /> IIPeriod Days Operational 248
<br /> IIPeriod Percent Operational 67
<br /> IIPeriod Extracted Ground Water 908,310
<br /> IIPeriod Pounds of TPHg Removed 4.64
<br /> Period Pounds of TPHd Removed 1,023
<br /> Period Pounds of TPHo Removed 731
<br /> Period Pounds of Benzene Removed 0.00
<br /> Period Pounds of TBA Removed 0.05
<br /> IIPeriod Pounds of MtBE Removed 0.00
<br /> I:\Tidewater\TW Stockton(Parcel 2A-0415)\Reports\QMR\2010\4Q10-Annual\4Q10 and Annual QSSRQRSRQMR Stockton_FINAL.doc 6.1
<br />
|