My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
203
>
3500 - Local Oversight Program
>
PR0545378
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:55:58 PM
Creation date
2/13/2020 3:48:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545378
PE
3528
FACILITY_ID
FA0006112
FACILITY_NAME
EDWARD PITTS
STREET_NUMBER
203
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
203 S LINCOLN AVE
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Smith Technology Corporation <br /> Quality Assurance/Quality Control Plan <br /> Revised February 1995 <br /> r <br /> deionized water. this procedure will be carried out on-site before sampling of other monitoring wells, if <br /> more than one well is to be sampled with the sample sampling device. <br /> Immediately prior to sampling, the depth to water(DTW) in tlie well will be recorded. The thickness <br /> of product on top of the groundwater, if present, will be measured using an interface probe. The <br /> procedure for monitoring is presented in Section 9.0 (GroundwaterMonitoringProtocol), <br /> If free product is detected, analysis of groundwater at the interface for dissolved product will not be <br /> conducted. A product sample will be collected for source identification. If all free product cannot be <br /> removed, an interval specific sampling device may be utilized to collect a sample from below the zone <br /> of free product. Before collecting groundwater samples from each well, the well will be purged until j <br /> indicator parameters (temperature, conductivity, and pH) stabilize. This will entail the removal of at <br /> least four well casing volumes by bailing or pumping. The criteria for determining well casing volumes <br /> and temporary storage of purged water is outlined in Section 10.0 (Well Development Protocol). The <br /> indicator parameter measurements will be taken both before ;and after purging of each well casing <br /> volumes. Once the well is purged and indicator parameters have stabilized, a sample will be collected <br /> after the water level approaches 80 percent of its initial elevation. Where water level recovery is slow, <br /> the sample will be collected after stabilization is achieved and I enough water is present to fill sample <br /> containers. <br /> Cross contamination from transferring pumps (or bailers) from-well to well will be avoided by utilizing <br /> dedicated equipment. Where this is not feasible, thorough cleaning of equipment will be performed <br /> between sampling rounds. Sampling will proceed from the least contaminated to the most i <br /> contaminated well, if information is available before sample collection, or.if it is indicated by field Z <br /> k <br /> W:\Admin\She11s\QAQC-97.D0C <br /> i 13 r <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.