My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_2005 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 4:59:42 PM
Creation date
2/19/2020 10:50:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2009
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page ..? of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: ❑Tank Manufacturer Ik Industry Standard ❑ Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure PVacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Vacuum pump and manometer Equipment Resolution: .05"in.hg <br /> Tank# 1 Tank# 2 Tank# 3 Tank# <br /> Is Tank Exempt From Testing?' ❑Yes WNo ❑Yes *No ❑Yes I)tNo ❑Yes -No <br /> Tank Capacity: 10,000 10,000 10,000 <br /> Tank Material: Steel Steel Steel <br /> Tank Manufacturer: Unknown Unknown Unknown <br /> Product Stored: 87 Octane gasoline 91 Octane Gasoline Diesel <br /> Wait time between applying <br /> pressure/vacuum/water and 30 mins. 30 mins. 30 mins. <br /> starting test: <br /> Test Start Time: 10:05 10:15 10:25 <br /> Initial Reading(Rj): 10" 10" 10" <br /> Test End Time: 11:05 11:15 11:25 <br /> Final Reading(RF): 10" 10" 10" <br /> Test Duration: 1 hr. 1 hr. 1 hr. <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: IL Pass ❑Fail It Pass ❑Fail Lk Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? Yes ❑No ❑NA if�Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and )LYes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> All tanks' annulars passed <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23,Section 2637(a)(6)} <br />
The URL can be used to link to this page
Your browser does not support the video tag.