Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer Nndustry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: Wressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Nitrogen bottle w/regulator and pressure gauge Equipment Resolution: 0.02 psi <br /> Piping Run# 1 Piping Run# 2 Piping Run# 3 Piping Run# <br /> Piping Material: FRP FRP FRP <br /> Piping Manufacturer: AO Smith AO Smith AO Smith <br /> Piping Diameter: 3" Y Y <br /> Length of Piping Run: 30' 31' 28' <br /> Product Stored: 87 octane gasoline 91 octane gasoline Diesel <br /> Method and location of The pipe was exposed <br /> piping-run isolation: for our upgrade work <br /> Wait time between applying <br /> pressure/vacuum/water and 30 mins. 30 mins. 30 mins. <br /> starting test: <br /> Test Start Time: 12:30 12:40 12:55 <br /> Initial Reading(Rj): 5 psi 5 psi 5 psi <br /> Test End Time: 1:30 1:40 1:55 <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: 1 hr. 1 hr. 1 hr. <br /> Change in Reading(RF-Rj): 0 psi 0 psi 0 psi <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: $ Pass ❑ Fail I Pass ❑Fail [°Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> All lines passed <br />