My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_2005 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 4:59:42 PM
Creation date
2/19/2020 10:50:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2009
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 15 of -7 <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer Wndustry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum NHydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: 719-w7at Equipment Resolution: <br /> UDC# UDC# UDC# UDC# <br /> UDC Manufacturer: Bravo <br /> UDC Material: Fiberglass <br /> UDC Depth: 35" <br /> Height from UDC Bottom to Top 17" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to None <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to New <br /> testing: <br /> Portion of UDC Tested Above penetrations <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both 114 Yes ❑No ❑NA ❑Yes ❑No ' INA -1 Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?` <br /> Turbine shutdown response time <br /> Is system programmed for fail- 1KYes ❑No ❑NA ❑Yes ❑No [INA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> safe shutdown?' <br /> Was fail-safe verified to be yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying I hr. <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: 11:00 <br /> Initial Reading(Rj): At paint line <br /> Test End Time: 1:30 next day <br /> Final Reading(RF): At paint line <br /> Test Duration: >24 hrs. <br /> Change in Reading(RF-R,): None <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: N.Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? XYes ❑No 11NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No [INA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> New UDC was lake tested for 24 hrs. and inspected by CUPA <br /> Test water was placed into labeled drum on site <br /> UDC was tested above all penetrations <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.