Laserfiche WebLink
SWRCB,January 2002 Page ,I of -7 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer [Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum [FIydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Standing water Equipment Resolution:painted line <br /> Jm, Sump# 3 Sump# Sump# Sump# <br /> Sump Diameter: 32" <br /> Sump Depth: 26" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 8" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 8" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Clean and dry <br /> Portion of Sump Tested' Above all <br /> penetrations <br /> Does turbine shut down when <br /> sump sensor detects liquid(both %Yes ❑No [INA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA []Yes ❑No ❑NA <br /> product and water)?" <br /> Turbine shutdown response time ij 3Cc <br /> Is system programmed for fail-safe NYes ❑No ❑NA ❑Yes []No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> shutdown?' <br /> Was fail-safe verified to be Y-Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 1 hr. <br /> test: <br /> Test Start Time: 11:00 <br /> Initial Reading(RI): At paint line <br /> Test End Time: 1:30 next day <br /> Final Reading(RF): At paint line <br /> Test Duration: >24 hrs. <br /> Change in Reading(RF-Ri): None <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: f$Pass ❑Fail ❑ Pass ❑ Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? *Yes ❑N o ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and I�yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Diesel piping- was lake tested for 24 hrs and inspected by CUPA <br /> Test water was placed into labeled drum on site <br /> Sump was tested above all penetrations <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to gny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />