Laserfiche WebLink
• -Re-work the existing dispensPr's existing electrical conduit to fit intim the new UDC <br /> • Relocate the two existing cc wits from the old card reader, one t ie new UDC and the other to the <br /> existing dispenser for UDC monitoring <br /> • Install the new, owner provided Healy bladder tank adjacent to the existing vent riser pipes behind the <br /> store building <br /> • Provide an approved steel enclosure for the Healy tank, as required <br /> • Install the Incon ISD system components under each dispenser <br /> • Backfill with existing material and place concrete at our work areas <br /> • Install the owner supplied dispensers (2) <br /> • Purge and calibrate the dispensers after commissioning by others <br /> • Provide for the precision line and vapor tests <br /> Please call with any question to 916-205-1537. <br /> T ank you, <br /> Mark Vendeiro <br /> MVP Petroleum Engineering, Inc. <br />