My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_2005 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 4:59:42 PM
Creation date
2/19/2020 10:50:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2009
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MVPPETRO EUM ENGINEERING NC.ACALIFORNIA CORPORATION <br /> mvpeng@att.net• PO Box 281 Folsom, CA 95763-0281• Phone(916)984.1537• Fax(916) 984-1117• Cellular(916)205-1537 CA#768938 <br /> March 5, 2009 <br /> Muniappa Naidu <br /> San Joaquin County Environmental Health Department <br /> Re: Express Market, Manteca <br /> Mr. Naidu: <br /> We are requesting a permit to perform the following work at the Express Market at 419 S. Main St. Manteca: <br /> We plan to install the Healy Phase II EVR and Incon ISD system. The Authority to Construct from San <br /> Joaquin Valley Air Pollution Control District, N-1159-1-3, has been received fro this work. <br /> Further, we plan to replace one UDC and both fueling dispensers. We are replacing the UDC because we <br /> plan to connect to the existing diesel product line adjacent to the dispenser that currently has diesel and run <br /> a new doublewall Smith pipeline to the second dispenser location. After the construction both dispensers will <br /> dispense diesel. <br /> The new UDC will be Bravo model # B-9000-B-EO. We will use the Smith Fibercast FRP entry fittings for the <br /> product and vapor lines. <br /> Soil samples will be taken at the direction of you by Sparger Technology, Ray James (owner). <br /> The work scope as presented to the owner: <br /> Mr. Mangat: <br /> The following represents our cost for the work to upgrade and change the fueling system at your Express <br /> Market in Manteca.- <br /> We <br /> anteca:We will: <br /> • Provide drawings for petroleum system construction and Health Department, Air Pollution <br /> Department, and Building Department electrical permit fees (no Planning Department fees are <br /> covered in this bid) <br /> • Remove and properly dispose of the existing dispensers <br /> • Cut, remove, and dispose of the concrete on and adjacent to the existing dispenser island that does <br /> not have diesel <br /> • Remove and dispose of the existing under dispenser containment pan <br /> • Hand dig a trench from the existing diesel product line location in front of the existing dispenser to the <br /> other dispenser location <br /> • Provide for soil samples and lab analysis in the piping trench and under the dispenser, as required by <br /> the Health Department <br /> • Install the owner supplied, new Under Dispenser Containment pan <br /> • Re-work the existing diesel product pipe to the other dispenser location <br />
The URL can be used to link to this page
Your browser does not support the video tag.