My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_1985 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 4:57:00 PM
Creation date
2/19/2020 11:53:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2004
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page:4 of: 7 <br /> 6. SUBMERSIBLE PUMP CONTAINMENT SUMP TESTING <br /> Test hod Developed By: ❑Tank Manufacturer ❑ Indust Standard <br /> �' rofessional Engineer <br /> ❑Other(Specify) <br /> est Method Uses: O Pressure <br /> ❑Vacuum Hydrostatic <br /> ❑Other(Specify) <br /> Measuring Equip. Used for Testing: <br /> Sump Diameter: <br /> Sump# Sump#' a Sump# <br /> h <br /> Sump Depth: 7 <br /> 7 <br /> Sump Material: 7� � <br /> Height from Tank Top to Highest <br /> Piping Penetration: ry <br /> Height from Tank Top to Highest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested (1) <br /> 4 Does turbine shut down when �S CSlc1�z / S5 <br /> sump sensor detects either <br /> product or water? <br /> Turbine shutdown response time(2) <br /> Is system programmed for fail-safe <br /> shutdown? <br /> Was fail-safe verified to be <br /> operational? . <br /> Wait time applying pressure/ <br /> vacuum/water and starting test: s <br /> i Test Start Test: <br /> Initial Reading (Ri): 2 00,02, <br /> Test End Time: Z •C4 �60 <br /> R �� <br /> Final Reading ��' S',•l 7 <br /> ( fl� /•Y3� p O <br /> Test Duration: <br /> Change in Reading (Rf <br /> Pass/Fail Threshold <br /> Te6t Result. <br /> Was sensor removed for testing? <br /> Was sensor replaced after testing. <br /> Comments-(include information on repairs made prior to testing) <br /> 1 If the testing method does not test the entire depth of the sump,specify how much of the sump was tested.Methods not <br /> testing the entire sump should only be used if the monitoring system provides fail-save turbine shutdown. <br /> 2 With the submersible pump running,place the sensor in product(discriminating sensors should also be placed in water). <br /> The time between placing the sensor in product and the turbine shutting down is the response time.This should be done if <br /> the secondary containment testing method used does not test the entire volume of the sump <br /> SWRCB <br /> 1 i <br />
The URL can be used to link to this page
Your browser does not support the video tag.