Laserfiche WebLink
Page:4 of:7 <br /> 6. SUBMERSIBLE PUMP CONTAINMENT SUMP TESTING <br /> Test Method Developed By: ❑Tank Manufacturer ❑ Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Uses: ❑Pressure ❑Vacuum ❑ Hydrostatic <br /> ❑Other(Specify) <br /> Measuring Equip. Used for Testing: <br /> W111111111Sump# Sump# Sump# <br /> Sump Diameter: <br /> Sump Depth: <br /> Sump Material: <br /> Height from Tank Top to Highest <br /> Piping Penetration: <br /> Height from Tank Top to Highest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: _ <br /> Portion of Sump Tested (1) <br /> Does turbine shut down when <br /> sump sensor detects either <br /> product or water? <br /> Turbine shutdown response time(2) <br /> Is system programmed for fail-safe <br /> shutdown? <br /> Was fail-safe verified to be <br /> operational? <br /> Wait time applying pressure/ <br /> vacuum/water and starting test: <br /> Test Start Test: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading (Rf): <br /> Test Duration: <br /> Change in Reading (Rf-Ri): <br /> Pass/Fail Threshold <br /> y "ScY Al <br /> 8S�'R@SUIt -:4 <br /> Was sensor removed for testing? <br /> Was sensor replaced after testing? <br /> Comments-(include information on repairs made prior to testing) <br /> 1 If the testing method does not test the entire depth of the sump,specify how much of the sump was tested.Methods not <br /> testing the entire sump should only be used if the monitoring system provides fail-save turbine shutdown. <br /> 2 With the submersible pump running,place the sensor in product(discriminating sensors should also be placed in water). <br /> The time between placing the sensor in product and the turbine shutting down is the response time.This should be done if <br /> the secondary containment testing method used does not test the entire volume of the sump <br /> SWRCB <br />