Laserfiche WebLink
Apr 18 03 06: 49p Fr ten Hill 559E 1467 p. 11. <br /> Page 3 of? <br /> SWRCB,January 2002 <br /> Express Manteca <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer <br /> Other(Sped) —. — <br /> Test ethod Used: Pressure Vacuum F-ydrostatic <br /> M <br /> Other(Specify) -- <br /> Test Equipment Used: Equipment Resolution: <br /> t� - Ron <br /> � <br /> No= <br /> Piping Run# Piping Run# Piping R un 4._ Piping Run# �n <br /> P7iping Material: — - - <br /> Pip- Manufacturer: - -- -- <br /> Piping Diameter. - - - <br /> Length of Piping Run: - ------� <br /> Product Stored: —--- - <br /> Method and location of <br /> piping-run isolation: ---- - <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: -- <br /> Test Start Time: --- — <br /> initial Reading(R): —. <br /> Test End Time: — - ------- <br /> Final Reading(RF): —— --- - <br /> Test Duration: --- <br /> Change in Reading(RF-Rj): —.-_--- - <br /> I <br /> Pass/Fail Threshold or <br /> Criteria: — <br /> Test Result: Pass Fail' Pass Fail Pass - Frail - Paas Fail--I <br /> Comments- (include information on repairs made prior to testing, and recommended fohox-up fir fi filed tests) ---__ <br />