My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_1985 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 4:57:00 PM
Creation date
2/19/2020 11:53:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2004
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Apr 18 03 06: 50p Fr*en Hill 559( 11.6" p. lz <br /> Page 4 of 7 <br /> SWRCB,January 2002 <br /> Express Manteca <br /> 6. PIPING SUMP TESTING -- <br /> Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer <br /> Other(Specify) - --- <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Spec) - - - <br /> Test Equipment Used: Equipmen:Resalubon: <br /> 1111111M11! NONE <br /> Sump# Sump# Sump its_ = S= UMP# <br /> Sump Diameter: ---- <br /> Sump Depth: - <br /> Sump Material: - - - �--� <br /> Height from Tank Top to Top of f - <br /> Highest Piping Penetration: - --- ----- <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: - <br /> Condition of sump prior to testing: - <br /> Portion of Sump Tested -. --- --- <br /> i <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No NA Yes No NA Yes 4o N,1 Yes No N'1% <br /> product and water)?* - - - <br /> Turbine shutdown response timeis system programmed for fail-safe Yes No NA Yes No NA Yes No N,k Yes No NA <br /> shutdown?* - --Was fail-safe verified to be Yes No NA Yes No NA Yes do NA Yes No NA <br /> operational?* ----- <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: - - <br /> Test Start Time: -- - <br /> Initial Reading(R,): -- - - -- <br /> Test End Time: -- -- <br /> Final Reading(RF): --- ----- <br /> Test Duration: -- ----- <br /> Change in Reading(RF-Ri): -- <br /> Pass/Fail Threshold or Criteria: _ - <br /> TestResalt• Pass Fail Pass Fail P:Iss Fail - Pass Fail <br /> Was sensor removed for testing? Yes No NA Yes No NA Yes_No NP_ Yes No NA <br /> Was sensor properly replaced and Yes No NA Yes No NA Yes No Nik 1 Yes No <br /> verified functional after testing? <br /> Comments-(include information on repairs made prior to testing,and recommended 'ow-up pr fulled tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to aqyof the qu.,-:;tions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.