Laserfiche WebLink
LATE REVISIONS— 19 March 2004 <br /> ITEM XX -UNITED STATES ARMY CORPS OF ENGINEERS, DEPARTMENT OF <br /> WATER RESOURCES AND THE PORT OF STOCKTON, STOCKTON <br /> DEEP WATER SHIP CHANNEL MAINTENANCE DREDGING <br /> ACTIVITES FROM CHANNEL MILE 4.4 TO MILE 41.0, CONTRA <br /> COSTA, SACRAMENTO AND SAN JOAQUIN COUNTIES-Consideration of <br /> a. Waste Discharge Requirements Revision <br /> Waste Discharge Requirements: <br /> Page 4 Finding No. 19, change to read: <br /> "...sulfide eemplexes precipitates to..." <br /> Page 10 Finding No. 41, change to read: <br /> "Sediments contain inorganic, organic material and ammonia." <br /> Page 10 Finding No. 41 and all other occurrences, of the term bioassay to read: <br /> "...bieassa toxicity test..." <br /> Page 20 Table A. 3 for Applicability of sediment elutriate, change to read: <br /> "...seluble constituents..." <br /> Page 20 Table A. 3 for Applicability of sediment elutriate, insert new row in table below <br /> Row No. 19 (COD)to read: <br /> "TOC Compare to RW..." <br /> Page 24 Insert new Prohibition No. 11, to read: <br /> "The discharge of decant water from Scour Pond I or McCormick Pit shall not <br /> contain a total copper concentration greater than five(S)parts per billion above <br /> the ambient river concentration. " <br /> Page 32 Add new Provision No. 7, insert to read: <br /> "At least 120 days prior to reusing dredge material from Scour Pond I or <br /> McCormick Pit DMD sites, the Discharger shall submit a Report of Waste <br /> Discharge." <br /> Page 32 Add new Provision No. 8 and then renumber remaining provisions, insert to read: <br /> "By 1July 2004, the Discharger must submit a Methylmercury Sampling and <br /> Analysis Plan for evaluating the concentrations) of methylmercury in Scour <br /> Pond I and McCormick Pit DMD sites, the adjacent reclamation ditches and the <br /> Scour Pond. The plan shall also contain (a) analysis for methylmercury <br /> concentrations in the stormwater runoff, berm seepage and in return flows; (b) <br /> the concentration of methylmercury in the sediment underlying the DMD sites (c) <br /> a map showing the proposed sample sites and rationale for site selection; and(d) <br /> a description of the proposed sample collection and preservation, analytical <br /> methods, and the detection limits for the selected analysis. Within 30 days <br /> following approval by the Executive Officer, the Discharger shall implement the <br /> plan." <br />