Laserfiche WebLink
1 11 Environmental Hazardous Materials <br /> Assessment Work Plan <br /> ACE Equipment Maintenance Facility,Stockton,CA <br /> Page 5 <br /> 6.0 PROJECT SCHEDULE <br /> Upon approval of this Work Plan by the EHD, acquisition of the UPRR Right of Entry Permit, and <br /> notification by the SJRRC to proceed, the field portion of the investigation can be completed within <br /> approximately two weeks. The turn-around time for laboratory analyses is approximately one week. A <br /> preliminary report can be submitted within one week of receipt of the laboratory analytical results. If you <br /> need additional information or have any questions,please call us at(209) 234-0518. <br /> Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES, INC. <br /> zll�' <br /> i_Z <br /> );:�'6— <br /> Michael McRivette Ro ald L. Skaggs, <br /> Environmental Specialist Division Manager <br /> P:\4002-SJRRC-Altamont Commuter Express\4002B ACE Maintenance Facility Phase 11 ESA\Reports\Work Plans\4002B Phase 11 Work Plan.doc <br /> ,�kOFESS/p� 9 FESSI <br /> LEE S q�0-ft Qk.O��® LEE s <br /> CIO C3 cc <br /> 2295 m cc 44588 N M <br /> CD corn <br /> rri <br /> EXP. 03106 d EXP 03/06 <br /> �F'�F 011L1F��� OF CAL\F� <br /> il� CONDOR <br />