My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HEINZ
>
2847
>
2900 - Site Mitigation Program
>
PR0521477
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 3:54:01 PM
Creation date
2/21/2020 1:44:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0521477
PE
2950
FACILITY_ID
FA0014584
FACILITY_NAME
UP RR ACE EQUIPMENT MAINT FACILITY
STREET_NUMBER
2847
STREET_NAME
HEINZ
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16707008
CURRENT_STATUS
01
SITE_LOCATION
2847 HEINZ ST
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 11 Environmental Hazardous Materials <br /> Assessment Work Plan <br /> ACE Equipment Maintenance Facility,Stockton,CA <br /> Page 5 <br /> 6.0 PROJECT SCHEDULE <br /> Upon approval of this Work Plan by the EHD, acquisition of the UPRR Right of Entry Permit, and <br /> notification by the SJRRC to proceed, the field portion of the investigation can be completed within <br /> approximately two weeks. The turn-around time for laboratory analyses is approximately one week. A <br /> preliminary report can be submitted within one week of receipt of the laboratory analytical results. If you <br /> need additional information or have any questions,please call us at(209) 234-0518. <br /> Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES, INC. <br /> zll�' <br /> i_Z <br /> );:�'6— <br /> Michael McRivette Ro ald L. Skaggs, <br /> Environmental Specialist Division Manager <br /> P:\4002-SJRRC-Altamont Commuter Express\4002B ACE Maintenance Facility Phase 11 ESA\Reports\Work Plans\4002B Phase 11 Work Plan.doc <br /> ,�kOFESS/p� 9 FESSI <br /> LEE S q�0-ft Qk.O��® LEE s <br /> CIO C3 cc <br /> 2295 m cc 44588 N M <br /> CD corn <br /> rri <br /> EXP. 03106 d EXP 03/06 <br /> �F'�F 011L1F��� OF CAL\F� <br /> il� CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.