Laserfiche WebLink
k` ■ K L E I N F E L D E R <br /> 3BACKGROUND <br /> Kleinfelder, Inc. understands that March Lane is proposed to extend from the undercrossing at <br /> the Southern Pacific Railroad to Holman Road. The city of Stockton is interested in addressing <br /> environmental concerns related to the March Lane Extension Project. Pesticides, herbicides, and <br /> metals may be present in an orchard located within the proposed extension area. Additionally, <br /> Blossom Ranch Farms (also within the project area) may have underground storage tanks <br /> (USTs). It is unknown if these tanks have leaked. Therefore, Kleinfelder recommended a limited <br /> Phase I and II Environmental Site Assessment. <br /> This report addresses Tasks 2, 3, 4 and 5 of Kleinfelder's "Proposal, Limited Phase I and II ESA, <br /> March Lane Extension to Holman Road, Stockton, California", dated June 22, 1998. This report <br /> addresses the Limited Phase II Environmental Site Assessment which includes a geophysical <br /> survey to identify potential UST locations. Based on the results of the geophysical survey, soil <br /> sampling was conducted in the potential UST areas. Soil sampling was also conducted in the <br /> orchard and field areas between SPRR and Holman Road. <br /> 20-3712-08.E02/2018R1090 Page 5 of 17 <br /> ©1998,k1einfelder,Inc. December 23, 1998 <br />