Laserfiche WebLink
M <br /> UniFirst Corporation page 3 <br /> 819 N. Hunter St, Stockton <br /> The permit is typically processed within a week and you should plan on drilling <br /> within 2-weeks of notification from SJCEHD that the permit has been issued. <br /> The report of findings for the monitoring well installation should be submitted to <br /> SJCEHD within 60-days of the last well installation. <br /> SJCEHD will review the report and comment on the conclusions and <br /> recommendations that are to be included. If chlorinated hydrocarbons/solvents <br /> are detected in the soil and/or ground water above levels that are allowed to be <br /> left in place uninvestigated/unremediated, the site will be referred to the <br /> CVRWQCB for continued investigation under their lead. <br /> Thank you for your investigative and remedial efforts to date. Please contact <br /> Michael Infurna at (209) 468-3454 if you have any questions. <br /> Donna Heran, REHS, Director <br /> Environmental Health Department <br /> Michael J. Infurna Jr., Senior REHS Margaret Lagorio, REHS <br /> LOP / Site Mitigation Unit IV Supervisor <br /> MI/ <br /> c: CVRWQCB — James Barton, Sacramento. <br /> c: Env Eng & Contr— Mark Zeko, 501 Parkcenter Dr, Santa Ana 92705 <br /> c: Unifirst— Peter Bernadicou, 819 N. Hunter St, Stockton. 95202 <br />