My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
248
>
2900 - Site Mitigation Program
>
PR0536908
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2020 6:40:29 PM
Creation date
2/24/2020 3:25:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536908
PE
2950
FACILITY_ID
FA0021186
FACILITY_NAME
INDUSTRIAL DRIVE RECEIVERSHIP ESTAT
STREET_NUMBER
248
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
17728020
CURRENT_STATUS
01
SITE_LOCATION
248 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> I. SECTION I-BACKGROUND................................................................................................4 <br /> A. Site History..................................................................................................................................4 <br /> LHistorical Chemical Usage.........................................................................................................4 <br /> 2.Indications of Past Spills/Releases..............................................................................................S <br /> 3.UST and AST Locations.............................................................................................................S <br /> 4.Maintenance Shop,Chemical Storage Areas..............................................................................S <br /> S.Future Uses................................................................................................................................6 <br /> B. Topography.................................................................................................................................6 <br /> C. Geology/Hydrogeology................................................................................................................7 <br /> (.Regional Geology and Hydrogeology..........................................................................................7 <br /> 2.Vicinity and Site Near-Surface Geology and Hydrogeology........................................................8 <br /> 3.Proposal for Further Characterization of Site Geology and Hydrogeology.................................9 <br /> II. SECTION II-PRIOR INVESTIGATIONS..........................................................................10 <br /> A. Subsurface Investigations by Others......................................................................................... 10 <br /> B. Pinnacle Environmental Investigations..................................................................................... 10 <br /> III. SECTION III-FIELD INVESTIGATION...........................................................................22 <br /> A. General......................................................................................................................................22 <br /> (.Monitoring Well Locations and Rationale................................................................................22 <br /> 2.Survey Details...........................................................................................................................22 <br /> 3.Equipment Decontamination Procedures.................................................................................22 <br /> 4.Health and Safety Plan.............................................................................................................22 <br /> B. Drilling and Logging Methods..................................................................................................22 <br /> C. Monitoring Well Design............................................................................................................23 <br /> D. Well Development......................................................................................................................24 <br /> E. Soil Sampling for Chemical Analyses........................................................................................24 <br /> F. Well Sampling...........................................................................................................................25 <br /> G. Water Level Measurements......................................................................................................27 <br /> IV. SECTION IV-QA/QC PROCEDURES................................................................................28 <br /> V. SECTION V-TIME SCHEDULE FOR PROPOSED WORK.............................................29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.