My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
248
>
2900 - Site Mitigation Program
>
PR0536908
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2020 6:40:29 PM
Creation date
2/24/2020 3:25:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536908
PE
2950
FACILITY_ID
FA0021186
FACILITY_NAME
INDUSTRIAL DRIVE RECEIVERSHIP ESTAT
STREET_NUMBER
248
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
17728020
CURRENT_STATUS
01
SITE_LOCATION
248 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tables <br /> Table 1 - Soil Vapor VOC Results, March 19-23, 2012 <br /> Table 2 - Soil Matrix TPH-cc Results from Vapor Locations,March 19-23, 2012 <br /> Table 3 - Soil Matrix VOC Results from Vapor Locations, March 19-23, 2012 <br /> Table 4 - Soil Matrix TPH-cc Results from Boring Locations, March 19-23, 2012 <br /> Table 5 - Soil Matrix VOC Results from Boring Locations, March 19-23, 2012 <br /> Table 6 - Soil Matrix TPH-cc Results from Groundwater Locations, March 19-23,2012 <br /> Table 7 - Groundwater TPH-cc Results, March 19-23, 2012 <br /> Table 8 - Soil Matrix VOC Results from Groundwater Locations, March 19-23, 2012 <br /> Table 9 - Groundwater VOC Results, March 19-23 and August 21-22, 2012 <br /> Table 10 - Pesticide, Herbicide, SVOC Results, March 19-23, 2012 <br /> Table 11 - Metals Results, March 19-23, 2012 <br /> Figures <br /> 1. Location Map <br /> 2. Aerial View of Site <br /> 3. Site Plan, 2013 <br /> 4. Topographic Map <br /> 5. Boring Log(typical,August 2012) <br /> 6. Site Sampling Locations, 2012 <br /> 7. Proposed Boring and Well Locations, 2013 <br /> 8. Monitoring Well Construction Detail <br /> 9. Well Development Log(Sample Form) <br /> 10. Well Sampling Log(Sample Form) <br /> Appendices <br /> A. Proposed Soil and Groundwater Sampling Locations with Area <br /> B. Health& Safety Plan <br /> Volume II <br /> Prior PEI Subsurface Investigations <br />
The URL can be used to link to this page
Your browser does not support the video tag.