My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
500
>
2900 - Site Mitigation Program
>
PR0544075
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2020 10:05:03 AM
Creation date
2/25/2020 8:43:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544075
PE
2965
FACILITY_ID
FA0013593
FACILITY_NAME
MORADA PRODUCE
STREET_NUMBER
500
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10504015
CURRENT_STATUS
04
SITE_LOCATION
500 N JACK TONE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MORADA PRODUCE COMPANY <br /> LINDEN PACKING SHED <br /> SAN JOAQUIN COUNTY <br /> The September 2002 RWD included an odor control contingency for the wastewater storage <br /> pond. If the pond generates odors, or if the dissolved oxygen level is less than 1.0 mg/L, then an <br /> aerator will be added to the pond <br /> The depth to groundwater is approximately 95 feet below ground surface and flows to the south- <br /> southeast, although locally, groundwater depth and flow may be influenced by local pumping <br /> and irrigation patterns. A groundwater sample was collected from the on-site well that serves the <br /> facility. Nitrate as nitrogen was reported in the sample at a concentration of 4.0 mg/L. These WDRs <br /> require installation of groundwater monitoring wells and monitoring of shallow groundwater <br /> conditions, including background water quality and direction of groundwater movement <br /> throughout the year. <br /> These waste discharge requirements contain hydraulic, organic, and nutrient loading limits for the <br /> land application areas, a time schedule for preparation of an Industrial Stormwater Permit, <br /> Groundwater Monitoring Workplan and Well Installation Report, an Operation and Maintenance <br /> Plan, and an evaluation of groundwater quality. <br /> TRO: 9/25/2003 <br /> V:\Sm Joaquin Nw15\SufT\Obrim'RSm luaquiu\Foppim UNFO.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.