Laserfiche WebLink
g) WATER REQUIREMENTS <br /> Daily consumption 3000 —6000 gallon per day during summer <br /> period. Fall and spring 1500— 3000 gallons per day. No water usage <br /> during the winter time. Water is to be obtained from water siphons <br /> on ranch. No processing of any water at this site. <br /> h) CONTAMINANTS <br /> The only contaminant would be the diesel fuel to be used in the <br /> water truck and wheel loader. The fuel is to be stored in a 1000 <br /> gallon self contained storage tank. <br /> i). WASTEWATER <br /> There will be no waste water for this project. <br /> D ORE PROCESSING <br /> There will be no ore processing for this project. No portals, shafts or <br /> or opening of any type. No screening or processing will be done <br /> at this site. <br /> k) IN-STREAM MINING <br /> In stream mining does not apply to this project. <br /> 1) TRAFFIC <br /> Traffic associated with this project will involve 11.8loads per day <br /> and one employee on-site, along with a water truck for dust control. <br /> 5 <br />