Laserfiche WebLink
TOPSOIL <br /> Authority Requirements/Practices/Standards or <br /> N/A <br /> CCRa 1 Removal of vegetation and overburden preceding mining shall be kept to a minimum. Pq <br /> When the reclamation plan calls for resoiling, mine waste shall be leveled and covered with a IVA <br /> CCR 3503(f) layer of finer material. A soil layer shall then be placed on this prepared surface. <br /> The use of soil conditioners, mulches, or imported topsoil shall be considered where such 0 <br /> measures appear necessary. <br /> CCR 3704(c) Mine waste shall be stockpiled to facilitate phased reclamation and kept separate from topsoil or <br /> other growth media. <br /> CCR 3705(e) If soil is altered or other than native topsoil, soil analysis is required. Add fertilizers or soil D <br /> amendments if necessary. <br /> CCR 3711(a) All salvageable topsoil shall be removed as a separate layer. J, <br /> Topsoil and vegetation removal should not precede mining by more than one year. <br /> Topsoil resources shall be mapped prior to stripping and location of topsoil stockpiles shown on <br /> map included in the reclamation plan. Kn <br /> CCR 3711(b) Topsoil and other growth media shall be maintained in separate stockpiles. A/A <br /> Test plots may be required to determine the suitability of growth media for revegetation <br /> purposes. A/ <br /> CCR 3711(c) Soil salvage operations and phases of reclamation shall be set forth in the reclamation plan to <br /> minimize the area disturbed and to achieve maximum revegetation success. 44 <br /> Topsoil and growth media shall be used to phase reclamation as soon as can be accommodated ffb <br /> following the mining of an area. <br /> CCR 3711(d) Topsoil stockpiles shall not be disturbed until needed for reclamation. RA <br /> Topsoil stockpiles shall be clearly identified. P <br /> Topsoil shall be planted with vegetation or otherwise protected to prevent erosion and �� <br /> discourage weeds. <br /> CCR 3711(e) Topsoil shall be redistributed in a manner resulting in a stable, uniform thickness consistent with p� <br /> the end use. f <br /> REVEGETATION <br /> Authority Requirements/Practices/Standards or <br /> N/A <br /> PRC 2773(a) The reclamation plan shall be specific to the property and shall establish site-specific criteria for <br /> evaluating compliance with the reclamation plan with respect to revegetation. <br /> CCR 3503(g) Available research regarding revegetation methods and selection of species given the <br /> topography, resoiling characteristics, and climate of the mined areas shall be used. <br /> Baseline studies shall be conducted prior to mining activities to document vegetative cover, <br /> CCR 3705(a) density, and species richness. N� <br /> Vegetative cover shall be similar to surrounding habitats and self-sustaining. <br /> CCR 3705(b) Test plots shall be conducted simultaneously with mining to ensure successful implementation of <br /> the proposed revegetation Ian. N�' <br /> CCR 3705(c) Decompaction methods, such as ripping and disking, shall be used in areas to be revegetated to N/X <br /> establish a suitable root zone for planting. <br /> CCR 3705(d) Roads shall be stripped of roadbase materials, resoiled, and revegetated, unless exempted. � <br /> Temporary access shall not disrupt the soil surface on arid lands except where necessary for <br /> CCR 3705 f( ) safe access. Barriers shall be installed to keepunauthorized vehicles out. NA <br /> Use local native plant species (unless non-native species meet the end use). NA <br /> CCR 3705(g) Areas to be developed for industrial, commercial, or residential shall be revegetated for the NA <br /> interim period to control erosion. <br /> CCR 3705(h) Planting shall be conducted during the most favorable period of the year for plant establishment. AIA <br /> CCR 3705(i) Use soil stabilizing practices and irrigation when necessary to establish vegetation. A/ <br /> Reclamation Plan Content Checklist—Page 5 of 6 Revised April 9,2018 <br />