My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MCDONALD
>
10450
>
2600 - Land Use Program
>
PA-1900177
>
SU0013013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2020 8:47:51 AM
Creation date
2/25/2020 10:18:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013013
PE
2605
FACILITY_NAME
PA-1900177
STREET_NUMBER
10450
Direction
W
STREET_NAME
MCDONALD
STREET_TYPE
RD
City
STOCKTON
Zip
95206-
APN
13106001
ENTERED_DATE
2/3/2020 12:00:00 AM
SITE_LOCATION
10450 W MCDONALD RD
RECEIVED_DATE
1/31/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CCR 37050) If irrigation is used, demonstrate that revegetation has been self-sustaining without irrigation for <br /> two years prior to the release of financial assurance. /1✓� <br /> CCR 3705(k) Noxious weeds shall be monitored and managed. <br /> Plant protection measures such as fencing and caging shall be used where needed for <br /> CCR 3705(1) revegetation success. Protection measures shall be maintained until revegetation efforts are A/q <br /> successfully completed and the lead agency authorizes removal. <br /> Quantitative success standards for vegetative cover, density, and species richness shall be 1Pv <br /> CCR3705(m) included in the reclamation plan. <br /> Monitoring to occur until success standards have been achieved. <br /> Sampling techniques for measuring success shall be specified. Sample size must be sufficient to �� <br /> provide at least an 80 percent statistical confidence level. <br /> AGRICULTURE <br /> Authority Requirements/Practices/Standards or <br /> N/A <br /> CCR 3707(a) Where the end use will be agriculture, prime agricultural land shall be returned to a fertility level P3 <br /> specified in the reclamation plan. <br /> CCR 3707(b) Segregate and replace topsoil in proper sequence by horizon in prime agricultural soils. A <br /> Post reclamation productivity rates for prime agricultural land must be equal to pre-project <br /> CCR 3707(c) condition or to a similar site for two consecutive years. y <br /> Productivity rates shall be specified in the reclamation plan. A// <br /> CCR 3707(d) If fertilizers and amendments are applied, they shall not cause contamination of surface or l� <br /> groundwater. <br /> CCR 3708 For sites where the end use is to be agricultural, non-prime agricultural land must be reclaimed <br /> to be capable of sustaining economically viable crops common to the area. <br /> Reclamation Plan Content Checklist—Page 6 of 6 Revised April 9,2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.