My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2610
>
1600 - Food Program
>
PR0536537
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2020 10:18:45 AM
Creation date
2/26/2020 10:01:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0536537
PE
1624
FACILITY_ID
FA0020977
FACILITY_NAME
STARBUCKS COFFEE #15641
STREET_NUMBER
2610
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24613018
CURRENT_STATUS
01
SITE_LOCATION
2610 S TRACY BLVD STE 150
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` SAN 10 A Q U I N Environmental Health Department <br />COUNTY— <br />The EHD must be kept informed of the construction progress. A final inspection must be performed, <br />operating permit fees paid, and approval to operate granted prior to opening for business. All <br />equipment must be installed and thorough cleaning completed prior to the final inspection. Inspections <br />must be scheduled at least 48 hours in advance. Charges for additional inspections, re -inspections <br />and/or consultations may be assessed at the EHD hourly rate of $152 per hour. <br />Any item(s) inadvertently overlooked in the plan check process, which is not in compliance with <br />applicable State laws, and/or city or county ordinance codes, shall be constructed or reconstructed <br />upon request of the EHD. Inferior workmanship, equipment, or materials will not be accepted for the <br />construction or operation of a food facility. Any variance from the requirements outlined in this letter <br />will require written approval from the EHD. Approval of the submitted plans shall become null and void <br />if the work authorized is not commenced within 180 days from the date of approval, or the work <br />authorized by such plans is abandoned. In order to renew action on an expired plan approval, the <br />applicant shall submit fees equal to that of a new plan review. A copy of the approved plans shall be <br />available on site at the time of final inspection. <br />If you have any questions, please contact Kadeanne Linhares, Senior Registered Environmental <br />Health Specialist, at (209) 468-0330. <br />Sincerely, <br />Jeff Carruesco, REHS, RDI <br />Program Coordinator <br />JCNP:kI <br />2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.