Laserfiche WebLink
Policy No. Revision Issue Date/Effective Date Review Date Page <br /> No. <br /> TRAC 3.10.1 3.5 March 2012 March 2015 24 of 24 <br /> Title: Incident & Illness Prevention Program <br /> 11. All approved safety procedures and permits must be followed at all times e.g. <br /> confined space entry, electrical lockout/tagout, entry control, hot work, etc. <br /> • Line Break and Equipment lock out tagout must be performed per Division policy <br /> D3.2.06 <br /> • Excavation and Concrete cutting must be performed per Division policy D3.2.04 <br /> • Confined Space entry must be performed per Division policy D3.2.02 and TRAC <br /> 3.2.02. <br /> • A permit is required for all work. If a Hot work, High Work, or Hazardous <br /> Energy permit does not apply to the job, then a Safe Work Permit must be <br /> completed per D3.2.10 <br /> 12. Only trained personnel will operate equipment. <br /> 13. Equipment will only be operated with guards in place. For special needs, a <br /> supervisor must give authorization to operate equipment without appropriate <br /> guards. <br /> 14. Illegal drugs and alcohol are not permitted. Prescription drugs that may impact <br /> alertness must be brought to a supervisor's immediate attention. <br /> 15. Horseplay or fighting is not permitted. <br /> 16. Facial hair that may interfere with respiratory equipment is not permitted. <br /> 17. Eating is restricted to the lunchroom, office and designated areas. Wash hands <br /> thoroughly before eating. <br /> 18. Do not drink water from any outlet, hose, or spigot. Drink water from approved, <br /> clean water coolers. Fresh drinking water is available via 5 gallon water <br /> containers located in the employee lunch room and the Powell machine laboratory <br /> 19. All ladders must be tied off at the top or secured in some manner to keep from <br /> slipping, shifting or falling. Division Policy D 3.2.26 Fall Protection Program <br /> describes the fall protection and high work requirements for the site. <br /> 20. The speed limit on site is 10 MPH for all vehicles. <br /> 21. Seatbelts must be worn while operating or riding in any motorized vehicle such as <br /> trucks, forklifts, etc. <br /> 22. All Production employees are required to have their radio on their person at all <br /> times when working in the process areas of the plant. Contractors working on site <br /> in the process areas should have one member of the crew wearing a radio. <br /> Security will issue radios to contractors. Contractor radios should be turned in to <br /> security at the end of each work day. <br /> I UNDERSTAND THE RULES OUTLINED ABOVE AND AGREE THAT I WILL COMPLY WITH <br /> EACH WHILE I AM PRESENT AT THE OLIN TRACY FACILITY. <br /> Signature: Date: <br /> Printed Name: <br /> Printed copies of this document are Uncontrolled <br />