Laserfiche WebLink
Work Plan for Preliminary Subsurface Investigation January 31, 1992 <br /> City of Stockton, former Western Pacific Railroad Property, Stockton, CA W0601.1B <br /> 7.0 REPORTING <br /> Upon completion of the preliminary investigation, a summary report will be prepared. The <br /> report will outline the history of the site, summarize the work performed, present the results of <br /> laboratory analysis, conclusions and recommendations for further work, if necessary. <br /> 8.0 PROPOSED SCHEDULE <br /> Following agency approval, the estimated time necessary to complete the tasks proposed in this <br /> work plan is approximately 10 weeks. The distribution of tasks proposed for each time period <br /> is shown on Figure 5. Actual time may vary depending on drill rig availability, regulatory <br /> review, laboratory turn-around and unforeseen field conditions. <br /> 9.0 REFERENCES <br /> Escobar, Jim, City of Stockton Public Works Department, personal communication, 1989. <br /> San Joaquin Flood Control and Water Conservation District, Semi-Annual Groundwater Report, <br /> Fall 1990. <br /> WP013192.SAY 6 <br />