My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 10:41:34 PM
Creation date
2/27/2020 3:48:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Com' ENVIRONMENTAL • CONSTRUCTION • COMPLIANCE <br /> MAY 2 7 2004 <br /> May 26, 2004 <br /> ENVIRONMENT HEALTH <br /> Mr. Steve Shih PERMIT/SERVICES <br /> San Joaquin County Environmental Health <br /> 304 East Weber Street <br /> Stockton, CA 95202 <br /> Subject: ELD Work Plan <br /> Tracy Chevron Station <br /> 2615 W Grant Line Road <br /> Tracy CA <br /> Dear Mr. Shih: <br /> Following is the enhanced leak detection work plan for the new Chevron station in Tracy. It is our <br /> understanding that the fuel system(s)at the site consists of the following: <br /> * (1)20,000 gallon UST and(1) 15,000 gallon UST <br /> * (6)multi product dispensers <br /> The horizontal sampling probes (HSP) consist of 3/4" slotted PVC. They are located within each <br /> piping trench within 60" horizontally and within 4" vertically from each piping run. They are not <br /> required on piping that has 3rd or tertiary containment. HSPS are also installed within 18"horizontal <br /> of all tanks at a minimum depth of 12" from the top of the tank or 12" above any known water table <br /> that might submerse the tanks. HSPS are installed between tanks when the distance between tanks is <br /> 36" or greater. HSP runs are terminated at grade level near dispensers and in a dedicated manhole at <br /> the tank farms for sampling purposes. <br /> If you have questions or need additional information,please don't hesitate to call. If we are unable to <br /> answer certain technical questions,we will gladly refer you to Praxair so you have all of the necessary <br /> information to approve this work plan and testing protocol. <br /> Sincerely, <br /> CGRS, Inc. <br /> Ilo eau <br /> FMP/CGRS IO/Correspondence/ 27 <br /> P.O. BOX 1489 ■ FORT COLLINS, COLORADO 80522 ■ PHONE: 970-493-7780 ■ FAX: 970-493-7986 <br />
The URL can be used to link to this page
Your browser does not support the video tag.