My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 10:41:34 PM
Creation date
2/27/2020 3:48:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16.3.2.5.If the sealant did not flow out at the containment sump 16.4. HYDROSTATIC WATER TEST <br /> joint,apply extra sealant and smooth it out all the way around 16.4.1.GENERAL <br /> the joint to ensure sufficient and even coverage.(See FIGURE 16.4.1.1.Test the containment sump assembly with water after <br /> 16-6, C.) allowing the time required to set(typically four to five hours). <br /> 16.3.2.6.For the next application of sealant,apply 1/4-inch- 16.4.1.2.Seal off any piping penetrations and other penetrations <br /> diameter beads around the inside groove of the containment found in the containment sump body. <br /> sump body.(See FIGURE 16-6,D.) <br /> 16.4.2.TESTING CONTAINMENT SUMP(NOT WATERTIGHT <br /> 16.3.2.7.Work the containment sump body back and forth,and MODEL) <br /> inspect the sealant for air bubbles.If air bubbles are present, 16.4.2.1.Fill the containment sump with water to a point 6 <br /> work them out and apply extra sealant material(if needed)so inches above the collar/containment sump body seam. <br /> there is sufficient and even coverage. <br /> 16.4.2.2.Mark and record the water level,and check it after one <br /> 16.3.2.8.Typically,the sealant will skin over in about 90 hour. <br /> minutes.(This varies according to temperature and humidity.) <br /> 16.4.2.3. Inspect all joints and penetrations for leaks. <br /> 16.3.2.9.Take care when exiting the containment sump after <br /> applying the sealant. 16.4.2.4. If no leaks are found,remove the water and continue <br /> the installation process. <br /> 16.3.3.SEALING CONTAINMENT SUMP BODY TO <br /> WATERTIGHT TOP 16.4.3.TESTING WATERTIGHT CONTAINMENT SUMP <br /> 16.3.3.1.To seal the watertight top to the containment sump F A WARNING <br /> body,seat the top onto the containment sump body,making sure Do not pressurize a watertight containment sump as this <br /> the top is centered in the channel.(See FIGURE 16-7,A.) could result in death or serious injury. <br /> CAUTION 16.4.3.1.Do not water test the watertight containment sump <br /> Take care not to damage the top lip when sealing the until after the sealant in the groove at the top of the containment <br /> watertight containment sump top. sump has sufficiently set. <br /> 16.3.3.2.Fill the space between the top and the outside edge of 16.4.3.2.Fill the containment sump with water to a point above <br /> the channel with sealant.(See FIGURE 16-7,B.) this outer groove at the top of the containment sump(in other <br /> words,to the top of the access cover lip). <br /> A 16.4.3.3.Mark and record the water level,and check it after one <br /> 1 hour. <br /> 16.4.3.4.Inspect all joints and penetrations for leaks. <br /> 16.4.3.5. If no leaks are found,remove the water and continue <br /> B the installation process. <br /> 16.4.4.REPAIRING LEAKS <br /> 16.4.4.1. If a leak is found in containment sump joints(top or <br /> FIGURE 16-7 bottom),mark the spot and drain the containment sump. <br /> 16.3.3.3.Apply additional sealant around the top edge to form a 16.4.4.2. Dry the leak area both inside and out. <br /> filler. (See FIGURE 16-7,B.) 16.4.4.3.Prepare the area by abrading around the leak <br /> at least 3 inches in each direction. <br /> 16.3.3.4.Inspect the sealant for air bubbles.If air bubbles are <br /> present,work them out and apply extra sealant material(if 16.4.4.4.Apply sealant to the abraded area. <br /> needed)so there is sufficient and even coverage. <br /> 16.4.4.5.Retest after sealant material sufficiently sets up. <br /> 16.3.3.5.Work the sealant so there is a tight"seal"of sealant <br /> between the edge of the top and the outside edge of the 16.5.WATERTIGHT COVER INSTALLATION <br /> channel.(See FIGURE 16-7,B.) 16.5.1.Inspect the gasket in the groove on the underside of the <br /> cover.Brush away any debris and make sure the gasket is clean. <br /> 16.3.3.6.Typically,the sealant will skin over in about 90 <br /> minutes.(This varies according to temperature and humidity.) 16.5.2.Check the top lip of the opening for nicks or cracks,and <br /> clean as necessary.If damage is detected,contact the UST <br /> 16.3.3.7.Take care when exiting the containment sump after coordinator at the Xerxes plant nearest you. <br /> applying the sealant. <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.