My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 10:41:34 PM
Creation date
2/27/2020 3:48:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16.5.3.Set the cover on the opening and seat it in place. 16.6.5.Set the street box,and check for clearance to allow <br /> access and space to remove the watertight cover.(See FIGURE <br /> 16.5.4.Open the clamping ring and fit it around the cover and 16-8,Area C.) <br /> top lip of the opening. <br /> 16.6.6.Continue with backfill,as required,to subgrade.(See <br /> 16.5.5.Slowly close the clamping ring with the lever making FIGURE 16-8,Area D.) <br /> sure both the cover edge and top lip are caught in the ring <br /> groove.Lock the lever in place. 16.6.7.Maintain good drainage of water away from the access <br /> CAUTION opening of the containment sump top. <br /> Do not force the clamping ring closed,or minor or moderate 17. ADDING TANKS AT EXISTING LOCATIONS <br /> injury may occur.If the clamping ring binds,rotate the cover <br /> and ring,and try again. 17.1.GENERAL <br /> 17.1.1.Additional Xerxes tanks may be installed at existing <br /> Note: The gasket in the watertight cover requires periodic locations if proper foundation support exists. <br /> replacement. <br /> 17.1.2.It is the responsibility of the tank owner to choose the <br /> 16.6.FINAL CONTAINMENT SUMP INSTALLATION correct method of installation. <br /> CAUTION 17.1.3.Xeres requires that one of the following methods be used. <br /> Make sure that no heavy objects are allowed to distort the 17.2.PREFERRED METHOD <br /> containment sump top after final assembly. This includes 17.2.1.The preferred method(FIGURE 17-1)is: <br /> the street box and concrete pad.No weight should be Install a new tank in a separate hole at least 3 feet from the <br /> transferred to the tank.Failure to do so may result in original hole. <br /> property damage. Follow procedures outlined in this Installation Manual. <br /> 16.6.1.Backfill to the top of the containment sump system. Exercise caution in keeping unusual surface loads off existing <br /> tanks. <br /> 16.6.2.Backfill around the outside edge of the containment Maintain the natural barrier of undisturbed soil between tanks. <br /> sump,making sure that no backfill is on top of the containment <br /> sump.(See FIGURE 16-8,Area A.) 36" <br /> Backfill Street Boz Barrier <br /> o Q, B <br /> 34 iFIGURE 17-1 <br /> Top of containment A <br /> sump system Typical Installation Backfill <br /> (watertight cover 17.3.ALTERNATE METHOD <br /> No Backfill shown) 17.3.1. If the referred method outlined above is not practical, <br /> on top of P <br /> containment sump an alternate method(FIGURE 17-2)is: <br /> Bury additional tanks in the same installation hole. <br /> • Empty existing tanks to less than 1/4 capacity. <br /> • Remove the surface slab. <br /> FIGURE 16-8 Enlarge the excavation for the new tanks,leaving as much <br /> backfill as possible around existing tanks. <br /> 16.6.3.Isolate the containment sump from all traffic loads. Install shoring,if necessary,to make sure that existing tanks <br /> 16.6.3.1.The contractor must install a concrete form/barrier to do not move and sufficient backfill remains. <br /> allow a minimum 3-inch clearance between any load-bearing Follow procedures and requirements outlined in this Installa- <br /> item(for example,the concrete pad/street-box frame)and the tion Manual. <br /> containment sump top. See SECTION 5 for excavation parameters. <br /> 16.6.3.2.Typically,a sheet of plywood(or other material)is used <br /> as a barrier and is set on the pea gravel to ensure that there is <br /> at least a 3-inch clearance above the containment sump top. <br /> (See FIGURE 16-8,Area B.) <br /> 16.6.4.Choose a street-box size that allows enough clearance <br /> around the containment sump top opening for proper operation <br /> of the cover. FIGURE 17-2 <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.