Laserfiche WebLink
FUEL SYSTEM NOTES <br /> 1. THE CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS AND VERIFY ALL SITE WORK TO <br /> BE DONE BEFORE COMMENCING WORK. IF SITE CONDITIONS OR DIMENSIONS DISAGREE WITH <br /> INFORMATION ON DRAWINGS OR CONFLICTS OCCUR, THE CONTRACTOR SHALL NOTIFY THE <br /> OWNER REPRESENTATIVE BEFORE PROCEEDING WITH ANY WORK. <br /> 2. PIPING SHOWN SCHEMATICALLY. CONTRACTOR SHALL INSTALL PIPING PER FIELD CONDITIONS <br /> WITH OWNER REPRESENTATIVE'S APPROVAL <br /> 3. ANY UNDERGROUND UTILITIES CROSSING SITE SHALL NOT CROSS OVER/UNDER PRODUCT, <br /> VAPOR OR VENT PIPING. IF A CONFLICT IS ANTICIPATED NOTIFY OWNER REPRESENTATIVE <br /> PRIOR TO COMMENCEMENT OF WORK. <br /> 4. ALL PRODUCT, VENT AND VAPOR RETURN LINES SHALL SLOPE 1/4" PER FT. UPWARD FROM TANK. <br /> 5. USE 3' VAPOR RECOVERY PIPING ALL THE WAY BACK TO REGULAR UNLEADED TANK. <br /> 6. LIQUID SUMP SENSORS SHALL BE WIRED FOR COMPLETE TURBINE AND DISPENSER SHUT—DOWN <br /> MEN A LEAK IS DETECTED, OR WHEN THE MONITORING SYSTEM FAILS OR IS DISCONNECTED. <br /> 7. TANK CONSTRUCTION/TESTING SHALL BE IN ACCORDANCE WITH NATIONALLY RECOGNIZED CODES. <br /> TANKS SHALL BE INSTALLED AS PER MANUFACTURERS SPECIFICATIONS. NEW PIPING SHALL BE <br /> INSTALLED PER MANUFACTURERS SPECIFICATIONS. THE UNDERGROUND STORAGE TANK SYSTEM, <br /> ALL PIPING, COUPLINGS, SEALANTS, ETC. SHALL BE COMPATIBLE WITH EACH OTHER AND 'NTH <br /> 8. BEFORE THE UNDERGROUND STORAGE TANK IS PLACED IN USE, THE UNDERGROUND STODDEPT. <br /> TANK SHALL BE TESTED AFTER INSTALLATION USING ONE OF THE FOLLOWfNG METHODS <br /> a DEMONSTRATE THAT THE TANK IS PRODUCT TIGHT. <br /> A, ENHANCED LEAK DETECTION. <br /> B. AN INERT GAS PRESSURE TEST THAT HAS BEEN CERTIFIED BY A THIRD PARTY AND <br /> APPROVED BY THE BOARD. <br /> CONTRACTOR SHALL PROVIDE THE DESIGN, SCOPE OF WORK AND APPLY FOR A SEPA <br /> PERMIT FOR THIS REQUIREMENT, TO THE SAN JOAQUIN COUNTY ENVIRONMENTAL HEALT <br />