My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 10:41:34 PM
Creation date
2/27/2020 3:48:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FUEL SYSTEM NOTES <br /> 1. THE CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS AND VERIFY ALL SITE WORK TO <br /> BE DONE BEFORE COMMENCING WORK. IF SITE CONDITIONS OR DIMENSIONS DISAGREE WITH <br /> INFORMATION ON DRAWINGS OR CONFLICTS OCCUR, THE CONTRACTOR SHALL NOTIFY THE <br /> OWNER REPRESENTATIVE BEFORE PROCEEDING WITH ANY WORK. <br /> 2. PIPING SHOWN SCHEMATICALLY. CONTRACTOR SHALL INSTALL PIPING PER FIELD CONDITIONS <br /> WITH OWNER REPRESENTATIVE'S APPROVAL <br /> 3. ANY UNDERGROUND UTILITIES CROSSING SITE SHALL NOT CROSS OVER/UNDER PRODUCT, <br /> VAPOR OR VENT PIPING. IF A CONFLICT IS ANTICIPATED NOTIFY OWNER REPRESENTATIVE <br /> PRIOR TO COMMENCEMENT OF WORK. <br /> 4. ALL PRODUCT, VENT AND VAPOR RETURN LINES SHALL SLOPE 1/4" PER FT. UPWARD FROM TANK. <br /> 5. USE 3' VAPOR RECOVERY PIPING ALL THE WAY BACK TO REGULAR UNLEADED TANK. <br /> 6. LIQUID SUMP SENSORS SHALL BE WIRED FOR COMPLETE TURBINE AND DISPENSER SHUT—DOWN <br /> MEN A LEAK IS DETECTED, OR WHEN THE MONITORING SYSTEM FAILS OR IS DISCONNECTED. <br /> 7. TANK CONSTRUCTION/TESTING SHALL BE IN ACCORDANCE WITH NATIONALLY RECOGNIZED CODES. <br /> TANKS SHALL BE INSTALLED AS PER MANUFACTURERS SPECIFICATIONS. NEW PIPING SHALL BE <br /> INSTALLED PER MANUFACTURERS SPECIFICATIONS. THE UNDERGROUND STORAGE TANK SYSTEM, <br /> ALL PIPING, COUPLINGS, SEALANTS, ETC. SHALL BE COMPATIBLE WITH EACH OTHER AND 'NTH <br /> 8. BEFORE THE UNDERGROUND STORAGE TANK IS PLACED IN USE, THE UNDERGROUND STODDEPT. <br /> TANK SHALL BE TESTED AFTER INSTALLATION USING ONE OF THE FOLLOWfNG METHODS <br /> a DEMONSTRATE THAT THE TANK IS PRODUCT TIGHT. <br /> A, ENHANCED LEAK DETECTION. <br /> B. AN INERT GAS PRESSURE TEST THAT HAS BEEN CERTIFIED BY A THIRD PARTY AND <br /> APPROVED BY THE BOARD. <br /> CONTRACTOR SHALL PROVIDE THE DESIGN, SCOPE OF WORK AND APPLY FOR A SEPA <br /> PERMIT FOR THIS REQUIREMENT, TO THE SAN JOAQUIN COUNTY ENVIRONMENTAL HEALT <br />
The URL can be used to link to this page
Your browser does not support the video tag.