Laserfiche WebLink
Stantec <br /> Quarterly Status Summary Report— Third Quarter 2012 <br /> Stockton Charter Way Commingled Plume <br /> October 12, 2012 <br /> This Quarter's Activities (Third— 2012) <br /> 1. Stantec prepared and submitted the Semi-Annual Groundwater Monitoring Report — <br /> Addendum Second Quarter 2012 on July 27, 2012. <br /> 2. Started initiated the permitting process and obtain bids from sub-contractors for the <br /> construction and install of the SVE/AS system on-site. <br /> 3. Stantec completed prefield activities in preparation of SVE/AS wells at the Chevron site. <br /> Next Quarter's Activities (Fourth—2012) <br /> 1. Blaine Tech Services, Inc. of Sacramento, California will perform the 4Q12 semi-annual <br /> groundwater monitoring and sampling event. <br /> 2. Stantec will install SVE and AS wells at the Chevron site. <br /> 3. Stantec will begin construction for AS/SVE system for the Chevron site. <br /> 4. Stantec will prepare the Semi-Annual Groundwater Monitoring Report — Fourth Quarter <br /> 2012 to be submitted by January 30, 2013. <br /> Stockton Charter Way Commingled Plume QSSR 3Q12.Final.doc 3 <br />