My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_MONTHLY STATUS REPORT - APRIL 2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1444
>
2900 - Site Mitigation Program
>
PR0527031
>
ARCHIVED REPORTS_MONTHLY STATUS REPORT - APRIL 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 11:37:44 AM
Creation date
2/28/2020 8:44:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
MONTHLY STATUS REPORT - APRIL 2013
RECORD_ID
PR0527031
PE
2957
FACILITY_ID
FA0018318
FACILITY_NAME
FORMER COLUMBO / TOSCANA BAKERY
STREET_NUMBER
1444
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16503005
CURRENT_STATUS
01
SITE_LOCATION
1444 S LINCOLN ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> Monthly Status Report - May 2013 <br /> Chevron Facility #92033 - Stockton Charter Way Commingled Plume No . CP0057 <br /> June 14 , 2013 <br /> AS System Operation <br /> The AS system operated in May 2013 with the following system alarms . On May 6 , 2013 , the <br /> AS system shut down due to an aftercooler high temperature alarm . Stantec adjusted the AS <br /> system air compressor variable frequency drive from approximately 60 to 45 hertz to generate <br /> less heat at the aftercooler. On May 8 and May 16 , 2013 , the AS system shut down due to SVE <br /> system alarms . On May 16 , 2013 , Stantec found oil on the air compressor exhaust vent , which <br /> may indicate a leak in the air compressor shaft seal . The manufacturer was contacted and <br /> restarting the AS system is pending manufacturer inspection/repair under warranty . The <br /> manufacturer will be scheduled for inspection/repair in June 2013 . In order to optimize sparging <br /> in the subsurface of the Site , the AS system is currently programmed to sparge in pulsed mode <br /> and cycle through three groups with overlapping time interval specified in the table below . Field <br /> notes and field parameter readings including flow rates and pressures are summarized in Table <br /> 5 and are included in Attachment A . <br /> AS SYSTEM PULSE MODE <br /> Group Sparge Wells Time Interval <br /> 1 AS- 1 , AS - 10 , AS. 11 , and AS- 12 23 : 40-04 : 00 , 11 : 40- 16 : 00 <br /> 2 AS- 3 , AS-6 , AS -8 , and AS-9 03 : 40-08 : 00 , 15 : 40-20 : 00 <br /> 3 AS-2 , AS4 , AS - 5 , and AS -7 07 : 40- 12 : 00 , 19 : 40-24 : 00 <br /> AS System Performance <br /> The AS system operated in May 2013 with the sparge pressure to each sparge well below its <br /> respective fracture pressure (Table 3 ) . Sparge manifold pressure ranged from 10 to 22 psi and <br /> sparge manifold flow ranged from 4 to 22 . 8 scfm . <br /> AS SYSTEM OPERATION AND PERFORMANCE <br /> Equipment inventory : AS with 15 hp , 60 scfm at 30 psi air compressor <br /> Reporting period : May 2013 (April 26 through May 16 , 2013 ) <br /> Period total flow rate (scfm ) : Average : 48 <br /> Period after- cooler pressure ( psi ) : Average : 20 . 4 <br /> Period operating hours : 355 / 74 % of scheduled runtime <br /> Operating hours since startup : 392 / 74 % of scheduled runtime <br /> Minimum Average Maximum <br /> Period well manifold pressure ( psi ) : 10 16 . 3 22 . 0 <br /> Period well manifold flow (scfm ) : 4 . 0 10 . 8 22 . 8 <br /> Remediation Recommendation <br /> Based on the system data , Stantec recommends continuous operation , maintenance , and <br /> optimization of the AS and SVE remediation system . <br /> Recent Correspondence <br /> No recent correspondence was received in May 2013 . <br /> This Month 's Activities (May 2013) <br /> 1 . Stantec operated the AS/SVE system located at Chevron Facility #92033 . <br /> Stockton Charter Way Commingled Plume Monthly Status Report - May. doc 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.