My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_MONTHLY STATUS REPORT - APRIL 2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1444
>
2900 - Site Mitigation Program
>
PR0527031
>
ARCHIVED REPORTS_MONTHLY STATUS REPORT - APRIL 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 11:37:44 AM
Creation date
2/28/2020 8:44:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
MONTHLY STATUS REPORT - APRIL 2013
RECORD_ID
PR0527031
PE
2957
FACILITY_ID
FA0018318
FACILITY_NAME
FORMER COLUMBO / TOSCANA BAKERY
STREET_NUMBER
1444
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16503005
CURRENT_STATUS
01
SITE_LOCATION
1444 S LINCOLN ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> Monthly Status Report - May 2013 <br /> Chevron Facility #92033 - Stockton Charter Way Commingled Plume No . CP0057 <br /> June 14 , 2013 <br /> 2 . Stantec prepared and submitted the Monthly Status Report - April 2013 to CRWQCB- <br /> CVR on May 14 , 2013 . <br /> 3 . Stantec collected influent and effluent vapor samples from the SVE system on May 24 , <br /> 2013 in accordance with the SJVAPCD ATC No . N -8790- 1 - 0 requirements . <br /> Next Month 's Activities (June 2013) <br /> 1 . Stantec will perform O & M on the AS/SVE system located at Chevron Facility #92033 . <br /> 2 . Stantec will prepare the Semi-Annual Groundwater Monitoring Report - Second Quarter <br /> 2013. <br /> Limitations <br /> This report was prepared in accordance with the scope of work outlined in Stantec's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this work plan was prepared and applicable to the location of the Site . It was <br /> prepared for the exclusive use of ARCO , Chevron , Sara Lee , and Shell for the express purpose <br /> stated above . Any re- use of this report for a different purpose or by others not identified above <br /> shall be at the user' s sole risk without liability to Stantec . To the extent that this report is based <br /> on information provided to Stantec by third parties , Stantec may have made efforts to verify this <br /> third party information , but Stantec cannot guarantee the completeness or accuracy of this <br /> information . The opinions expressed and data collected are based on the conditions of the Site <br /> existing at the time of the field investigation . No other warranties , expressed or implied are <br /> made by Stantec . <br /> Prepared by: Reviewed By : <br /> Jose Yan A ar' eet Ran i <br /> P 1 9 <br /> Engineering Associate Engineering Associate <br /> Information , conclusions , and recommendations provided by Stantec in this document regarding <br /> the site have been prepared under the supervision of and reviewed by the licensed professional <br /> whose signature appears below. <br /> Reviewed By : Licensed pprover : <br /> ifr <br /> Dan Schreiner, P . G . Ed Law on , P . E . <br /> C75 63 :a <br /> Senior Geologist Seni r ngineer * E . uG M - 14 <br /> June 14 , 2013 <br /> ar CAVYV o <br /> Stockton Charter Way Commingled Plume Monthly Status Report - May. doc 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.