Laserfiche WebLink
B.5) The main fitting body (Item A) should be installed to <br /> the outside first. Then apply adhesive as shown (Fig. 135). <br /> . Adhesive <br /> Injection <br /> The Adhesive Injection Port on the fitting body Port <br /> must be at the 12-o-Clock or North Position. 5 20 <br /> B.6) Apply adhesive to the Main Body's outer surface I-(`0" X) <br /> (Fig. 135) 360 where shown. <br /> DEr�r;i i'vi=NT <br /> Fig. B5 Fig. B9 <br /> Fill & <br /> Adhesive Bead <br /> Here <br /> 360° <br /> Item B <br /> Item A (Flange) <br /> (Main body) <br /> Adhesive <br /> OUTSIDE <br /> Install Main body to outside of sump Install the loose Flange <br /> and apply adhesive to areas shown and use gloved finger to run a <br /> generous bead along joint. <br /> B.7) After applying adhesive to all contact areas (Fig. 135) Fig. B8 <br /> Apply the flange over the fitting and to the wall. <br /> B.8) Apply the Bravo Clamp immediately as shown in Fig. 138. Install clamp '` <br /> shown to the body roughly 1/4"from the face and tighten. Then hand-tighten ......... <br /> each bolt so it is snug.Apply a 1/4 - 1/2 turn to each bolt evenly until then <br /> clamp starts to slide away from the wall and flush with the face of the fitting. <br /> CLAMP <br /> B.9) Apply a generous bead of adhesive as shown. (Fig. B9). f INSIDE <br /> B.1 U) Glue all penetration fittings and allow to cure following the <br /> pipe manufacturers adhesive instructions. <br /> 7 ii-F-Series-1 X-SS-11 A <br />