Laserfiche WebLink
R F.CEIVEL) <br /> igGfrrtER-RYAN &c. JUN 0 2 2015 GR Job# 20-630774.1 <br /> SWRCB,January 2002 <br /> ENVIRONMENTAL Page 2 of 3 <br /> 6.PIPING`0ffV` &RE"' <br /> Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer <br /> Other(specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(specify) <br /> Test Equipment Used: Incon Equipment Resolution: 0.0001 <br /> Sump# Fent Sum # Sum # sump# <br /> Sump Diameter: 24" <br /> Sump Depth: .111, <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 10" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 14" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good <br /> Portion of Sump Tested(t) Above Penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes I' Q NA Yes No NA Yes No NA Yes No NA <br /> product and water)?* <br /> Turbine shutdown response time N/A <br /> Is system programmed for fail-safe Yes , ' NA Yes No NA Yes No NA Yes No NA <br /> shutdown?* <br /> Was fail-safe verified to be Yes NA Yes No NA Yes No NA Yes No NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10ruin <br /> test: <br /> Test Start Time: 11:20 <br /> Initial Reading(Ri): 4.8340 <br /> Test End Time: 11:35 <br /> Final Reading(Rf) 4.8345 <br /> Test duration: 15min <br /> Chane in Reading(Rf-Ri): 0.0005 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Results: X Pass Fail Pass Fail Pass Fail Pass Fail <br /> Was sensor removed for testing? No NA Yes No NA Yes No NA Yes No NA <br /> Was sensor properly replaced and <br /> verified functional after testing? gy. i <br /> No NA Yes No NA Yes No NA Yes No NA <br /> Comments-(include information on repairs made prior to testing,and recommend follow-up for failed tests) <br /> (1)If the entire depth of the sump is not tested,specify how much was tested. If the answer to gay of the questions indicated with an <br /> asterisk(+)is"NO"or"NA",the entire sump must be tested.(See SWRCB LG-160) <br />