My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2020 9:13:35 AM
Creation date
2/28/2020 1:04:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
476
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 1 Piping Manufacturer Industry Standard Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Calibrated gauges Equipment Resolution:0.00" <br /> Piping Run#87 P Piping Run#91 P Piping Run#Diesel P Piping Run #VR <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Enron Enron Enron Enron <br /> Piping Diameter: 3.00" 3.00" 3.00" 3.00" <br /> Length of Piping Run: 250.00' 245.00' 240.00' 200.00' <br /> Product Stored: 87 91 Diesel 87/91 <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 1:30pm 1:30pm 12:30pm 12:30pm <br /> Initial Reading(R,): 5.00psi 5.00psi 5.00psi 5,00psi <br /> Test End Time: 2:30pm 2:30pm 1:30pm 1:30pm <br /> Final Reading(RF): 5.00psi 5.00psi 5.00psi 5.00psi <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-Rr): 0.00" 0.00" 0.00" 0.00" <br /> Pass/Fail Threshold or <br /> 0.001, o.000.001, o.000.001, " <br /> 0.00 <br /> Criteria: <br /> Test Result: ❑ Pass ❑Fail 10 Pass ❑Fail ❑ Pass Fail Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Test boots replaced on 91 and 87 product secondary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.